References


 

2016

Emerson Process Management, Power and Water Solutions sp. z o.o. – „Engineering and installation works in Control & Instrumentation Systems for Ovation system in ENEA Wytwarzanie (Power Plant Kozienice) ”

APS Energia S.A. – „Power Distribution Systems and Control & Instrumentation Systems installation works for APS Energia – Stanisławów Pierwszy”

ENEA Wytwarzanie S.A. – „Modernization of Distributed Control System for unit No 4,5 and 6 in ENEA Wytwarzanie (Power Plant Kozienice)”

Doosan Babcock Energy Polska sp. z o.o. – „Modernization of the turbine drainage system TG-5 for unit No 5 in ENEA Wytwarzanie (Power Plant Kozienice)”

POLTRAMP YARD S.A. – „Power Distribution Systems installation works on a ship unit BoDo Constructor, Świnoujście”

Instytut Automatyki Systemów Energetycznych sp. z o.o. – Carrying out of Control & Instrumentation Systems installation for project „Modernization of the Digital Complex Security System of unit No 5 ”in ENEA Wytwarzanie (Power Plant Kozienice)

ELSTA sp. z o.o. – „Control & Instrumentation Systems installation works in ENEA Wytwarzanie (Construction of the Power Unit 11, Power Plant Kozienice)”

VALMET TECHNOLOGIES – „Control & Instrumentation Systems installation works for Soda Ciech, Inowrocław”

POLIMEX-MOSTOSTAL S.A. – „Carrying out of Control & Instrumentation Systems installation works on objects: cooling water pumping station, cooling water piping in turbine hall, raw water system and management of technological waste water for ENEA Wytwarzanie (Power Plant Kozienice)”

ZRE Katowice S.A. – „Electrical and I&C Erection work connected with precoated filter casing in the building of Station DEMI II in ENEA Wytwarzanie (Power Plant Kozienice)”

VALMET TECHNOLOGIES – „Control & Instrumentation Systems installation works for Selective Catalytic Reduction system (SCR) for Soda Ciech, Inowrocław”

PORR Polska Infrastructure S.A. – „Power Distribution Systems for Elektrociepłownia Siekierki”

POLIMEX-MOSTOSTAL S.A. – „Control & Instrumentation Systems installation works for water installation DEMI II in ENEA Wytwarzanie (Power Plant  Kozienice)”

POLIMEX-MOSTOSTAL S.A. – „Carrying out of Control & Instrumentation Systems installation works in ENEA Wytwarzanie (Power Plant Kozienice)”

PLESMAR sp. z o.o. – „Control & Instrumentation installation works for the purpose of building a school in Wilanów”

CERNEY S.A. – „Power Distribution Systems installation works in ENEA Wytwarzanie (Power Plant Kozienice)”

VALMET TECHNOLOGIES – „Electrical engineering works and installation works within the scope of Control & Instrumentation works related to Flue Gas Desulfurization Plant for Soda Ciech, Inowrocław”

VALMET TECHNOLOGIES – „Control & Instrumentation installation works for Soda Ciech, Janikowo”

RAFAKO S.A. „Implementation of teletechnical installation for Elektrociepłownia, Grupy Azoty Zakładów Azotowych Kędzierzyn S.A.”

2015

Mitsubishi Hitachi Power Systems, Ltd.S.A. Poland – „Supply of Transformers and Switchgears, Modification Work of Existing Equipment and Electrical and I&C Erection Work fot the SCR Plant Kozienice Boiler K1 and K2 in Poland”;

ENEA Wytwarzanie sp. z o.o.– Modernization activities of DCS automation systems and sample collector cooling water supply system for Unit 1 and 2;

INSTAL Kraków S.A.–Carrying out Control & Instrumentation Systems installation for project “Construction of flue gas ducts, booster fans and support channels starter for Flue Gas Desulphurization (FGDP IV) for a capacity of approx. 800 MWe (for units No. 1-8) in ENEA Wytwarzanie sp. z o.o.”;

MONDI Świecie S.A. – Carrying out of Control & Instrumentation systems installation for MP4 and Mass semichemical;

POLIMEX- MOSTOSTAL S.A. –Power distribution systems and Control & Instrumentation systems modernization for Gypsum Transportation system – Installation of Flue Gas Desulfurization IOS IV ENEA Wytwarzanie sp. z o.o.;

SAVEX S.A./ SterEnergo Projekt sp. z o.o. – Modernization of Smokestack 3 within the scope of Power Distribution systems, Lightning Protection systems, Control & Instrumentation systems and System of Continuous Monitoring Emissions (SCME) in Kozienice Power Plant;

Instytut Automatyki Systemów Energetycznych sp. z o.o.Equipment & Wiring installation and supplying within the scope of work “Carrying out Unit protection digital system in terms of oil burners control system for Units 1 and 2” for ENEA Wytwarzanie sp. z o.o.;

Instytut Automatyki Systemów Energetycznych sp. z o.o.– Equipment & Wiring installation and supplying within the scope of work “Modernization of turbine dynamic mode control system of Units 1 and 2”  for ENEA Wytwarzanie sp. z o.o.;

INELSEV s.r.o. – Control & Instrumentation systems installation works in Synthos S.A.;

MTM Projekt  sp. z o.o.– Power distribution systems installation works related to SCR system for Boilers K7 and K8 at Power Plant “Rybnik”;

AIUT sp. z o.o.– Installation works on site of Synthos S.A.;

AUTEL sp. z o.o.– Vibration measurement systems installation works for MONDI Świecie S.A.;

ABB sp. z o.o.– Control & Instrumentation systems installation works of Flue Gas Desulphurization unit for Power Plant “Turów”;

TAMAR sp. z o.o. sp. k.– Carrying out modernization of Turbine TG1 and TG2 Drainage systems for ENEA Wytwarzanie sp. z o.o.;

PROCOM SYSTEM S.A.– Carburizing system modernization – ETAP IV – Replacement of LV Main Distribution Boardfor ENEA Wytwarzanie sp. z o.o.;

Bilfinger Industrial Services Polska sp. z o.o.– Installation works on the site of Combined Thermal and Heat Power Plant “Siekierki”;

Ethos Energy sp. z o.o.– Installation works for TG-2 on the site of Kozienice Power Plant;

REMEL sp.z o.o. – Carrying out supply and installation works of Control & Instrumentation systems – MONDI Świecie S.A.;

Doosan Babcock Energy Polska sp. z o.o. – Power Distribution systems and Control & Instrumentation systems installation works related to reconstruction of DCS in SEJ Combined Thermal and Heat Power Plant “Zofiówka”;

Chemoproject Nitrogen a.s.– Installation works on the site of AZOMURES S.A.- Romania;

MONDI Świecie S.A. – Control & Instrumentation installation works – modernization of MP2;

ZRE Katowice S.A.– Control & Instrumentation installation works for Boiler K1 and K2 in Enea Wytwarzanie sp. z o.o.

 

2014

ENEA Wytwarzanie S.A.–  Modernization of DCS Automation systems for Units 3 and 4 on the site of Kozienice Power Plant;

SIRIUS POLSKA Sp.z o.o.– Flue Gas Desulphurization unit construction (Stage IV) in Enea Wytwarzanie sp. z o.o.;

ENEA Wytwarzanie S.A – Modernization of the I&C system of physicochemical measurements on Unit 5 and 7 on the site of Kozienice Power Plant;

MONDI Świecie S.A. – Replacement of sensors wiring in Paper Machine 5 (MP5);

Mega-System Przedsiębiorstwo Instalacyjne Bogusław Myrcha – Carrying out installation works of Solar Power Plant (capacity 20kWp) on the roof of production shop „Korczowa”;

·         ENEA Wytwarzanie S.A.–  Control & Instrumentation systems repair works on Units 8x200MW and 2x500MW and on the site of Kozienice Power Plant;

·         ZPAS-NET Sp. z o.o.– Modernization of automation systems DCS on unit No. 10 on the site of Kozienice Power Plant;

·         AUTEL Sp.z o.o. – Installation works and supply within the scope of work Control & Instrumentation systems of Papier Machine MP5 – MONDI  Świecie S.A.”;

Instytut Automatyki Systemów Energetycznych Sp.z o.o. – Equipment & Wiring installation and supplying within the scope of work “Modernization of turbine dynamic mode control system of Unit 7”  for ENEA Wytwarzanie sp. z o.o.

ENEA Wytwarzanie S.A.–  Carrying out DCS automation system modernization of Unit 7 on the site of Power Plant Kozienice;

AGP Metro Polska S.C. – Production, supplying and commissioning of 250 pcs. LV Distribution boards for 7 stations of II line of Warsaw Metro;

TAMAR Sp. z o.o. Sp. k. – Power distribution systems installation works within the scope of work „Modernization of turbine drainage system for Unit TG-7 in ENEA Wytwarzenie sp. z o.o.;

Emerson Process Management, Power and Water Solutions Sp. z o.o. – Supply, installation works and commissioning „turnkey” of Control &  Instrumentation systems for Wet Flue Gas Desulfurization unit CHP Plant Gdynia;

Emerson Process Management, Power and Water Solutions Sp. z o.o. –  Supply, installation works and commissioning „turnkey” of Control &  Instrumentation systems for Wet Flue Gas Desulfurization unit – Kogeneracja Wrocław;

PPHU TECHMONT – Cable installation works for boiler facilities  – ENEA Wytwarzanie sp. z o.o.;

EthosEnergy Sp. z o.o. – Control & Instrumentation installation works at turbine set TG-7 Power Plant Kozienice;

ENEA Wytwarzanie S.A. – DCS Automation systems modernization at the Unit 8 on the site of Power Plant Kozienice;

OMC ENVAG Sp.z o.o. – Carrying out Control & Instrumentation installation works of SCME system for Flue Gas Desulfurization Unit IV on the site of Power Plant Kozienice;

PPU EKOWENT Sp.z o.o. – Contracts of carrying out Power Distribution systems and Control & Instrumentation systems installation works for auxiliary fans in Power Plant Kozienice;

·         Mitsubishi Hitachi Power Systems, Ltd.S.A.  Poland –  Electrical Engineering works and Installation works within the scope of Control & Instrumentation works related to Denitrification Gas Unitat the site of Power Plant Kozienice;

ENERGOSTER Sp. z o.o. – Carrying out cable installation works within servomotors set SP and NP and cable & equipment supply for turbine set TG-7 Power Plant Kozienice;

·         POLIMEX-MOSTOSTAL  – Control & Instrumentation system modernization of the Gypsum transportation system Kozienice Power Plant;

AIUT Sp. z o.o. – Carrying out Control & Instrumentation installation works on the site of Synthos Dwory S.A.”

2013

Emerson Process Management Power and Water Solutions Sp. z o.o.– Control & Instrumentation installation works while connecting facilities to DCS system during construction works of Flue Gas Denitrification Unit for the Boilers K4-K8 Kozienice Power Plant;

RAFAKO SA– Control & Instrumentation systems and cable routes installation works at Flue Gas Denitrification Unit for the Boilers K4-K8 Kozienice Power Plant;

NAVITEL sp.z oo.– Supply and installation works of renewable source energy hybrid system (solar panels, wind turbine and generator) to feed a telecommunication equipment station;

ENEA Wytwarzanie SA o. Elektrownia Kozienice  – Supply, installation works and commissioning of remote station sampling of water and wastewater over Row Michałowski and data transmission system to Kozienice Power Plant;

PROCOM Automatyka Przemysłowa sp.z oo.– Supply and installation works of ammonia detection system for Flue Gas Denitrification Unit for the Boilers K4-K8 Kozienice Power Plant;

TAWI sp. z oo.– Control & Instrumentation systems and cable routes installation works during mounting activities of Steam Turbine set 1,6MW, modernization of LV Auxiliary Loads panel, also supply, installation works and commissioning of new busduct system on the site of CH&P Plant “Starograd Gdański” ;

METSO Automation Polska sp.z oo.– Control & Instrumentation systems and Power Distribution systems site review activities, new equipment supply, installation works during modernization of the Unit BC100 on the site of “Dalkia” CH&P Plant – IV Łódź;

ENEA Wytwarzanie SA o. Elektrownia Kozienice  – Control & Instrumentation systems modernization of Physicochemical measurements system  and cooling system for the Units 6 and 8 on the site of Kozienice Power Plant;

AUTEL SA, Trinec, Czechy– Control & Instrumentation systems and cable routes installation works under modernization of Papier Machine MP-2 MONDI Świecie;

Polimex-Mostostal SA– Carrying out works in the field of Power Distribution and Control & Instrumentation systems of Drainage pipeline for Turbine TZ8 on the site of Kozienice Power Plant;

ABB sp.z oo.– Power Distribution and Control & Instrumentation systems installation works for II Line of Warsaw Metro ;

KINGSPAN sp.z oo. Lipsko– Carrying out electrical equipment installation works and programming PLC under Insulation Sandwich panels production line control systems replacing activities;

REMEL sp.z oo. Świecie – Carrying out cable routes installation works under modernization of Papier Machine MP-4 on the site of Pulp and Paper Plant “ARCTIC PAPER” Kostrzyń

2012

Elektrobudowa SA– Project of ENEFIT280, NARVA, ESTONIA. Carrying out cable routes installation works on the site of Bituminous schists oil obtaining facility;

PROCOM System SA– Modernization of LV Distribution Board RWA-RWB in the Carburizing Central Control room on the site of Kozienice Power Plant;

ENEA Wytwarzanie SA o. Elektrownia Kozienice  – Control & Instrumentation systems modernization of the Unit 3 Kozienice Power Plant;

JTC SA– Control & Instrumentation systems and cable routes installation works for a new biomass boiler (50MWth capacity) in Power Plant “Jaworzno II”;

Instytut Automatyki Systemów Energetycznch Sp. z o.o.– Unit KUZB protection system modernization and installation works within the scope of Measurements system modernization of the Unit 3 Kozienice Power Plant;

SKANSKA  SA– Supply, installation works and commissioning of Vertical axis Wind Turbine set 3kW capacity on the site of America School of Warsaw in Konstancin-Jeziorna;

Energotechnika-Energorozruch SA– Control & Instrumentation systems and cable routes installation works under oil burners mounting activities at the Unit 3 TPP “Kozienice”

Energoster sp.z oo.– Control & Instrumentation systems and cable routes installation works, delivery of cables for HER regulator at the Unit 3 TPP “Kozienice”

Polimex-Mostostal SA– Electrical equipment installation works for the Turbine TZ3Drainage systems pipelines Kozienice Power Plant;

APS Energia SA– Supply, mounting works and commissioning of emergency power supply diesel-generator 500kW capacity for  ZEC Bielsko-Biała;

TurboCare sp. z oo.– Control & Instrumentation systems dismounting / mounting works, special measurements and data removal / implementation of valves WP, SP under modernization of the Turbine set TZ6 (13K215) on the site of Power Plant “Dolna Odra”;

APS Energia SA–  Carrying out mounting works of emergency power supply system for EdF CH&P Plant Wrocław;

Elektrobudowa SA– Carrying out cable routes installation works  for Paper Machine MP6 of Pulp and Paper Plant STORA ENSTO Ostrołęka;

Polimex-Mostostal SA–Carrying out electrical equipment installation works for Turbine TZ6 Drainage system pipeline on the site of Kozienice Power Plant;

Zakłady Azotowe Puławy SA–Power Distribution systems, Electrical Lighting & Small Power systems installation works within warehouse and packing facility of solid fertilizers production line;

AUTEL SA, Trinec, Czechy– Control & Instrumentation systems and cable routes installation works at Turbine set 6,5MW and Heat Exchanger 14MW for PGE GiEKSA CH&P Plant Kielce;

BCE Systems sp.z oo.– Steel structures and electrical equipment installation works, supply of explosion decoupling system equipment for the Boilers K3, K5, K6 (OP-650) Kozienice Power Plant.

2011

Elektrownia Kozienice SA– DCS Automation systems modernization of the Unit 2;

Elektrownia Kozienice SA– Modernization of Aeration air heater installed in the Unit 2 ash removal system;

Sirius Engineers Polska Sp. z o.o.(HITACHI Group)– Carrying out catalytic flue gas denitrification system installation works for the Boilers 10, 11, 14 and 15 CH&P Plant Siekierki;

Elektrownia Kozienice SA– Unit 1 Coking plant modernization;

Emerson Process Management Power and Water Solutions Sp. z o.o.–Prefabrication of Ovation panel;

APS Energia SA– Carrying out mounting works;

Energoster Sp. z o.o. –  Control & Instrumentation systems installations works for TG-1 EHR system Kozienice Power Plant;

Elektrobudowa SA– Carrying out electrical testing activities on the construction site of Stadion Narodowy in Warsaw;

Polimex Mostostal S.A.– Control & Instrumentation systems and electrical equipment installation works at the Unit 1 Extraction of oil vapors system TPP “Kozienice”

Polimex Mostostal S.A.– Control & Instrumentation systems and electrical equipment installation works related to construction of Feeding steam to the coal mills system for the Boilers K-1…K-6 Kozienice Power Plant;

Dürr Poland Sp. Z o.o.– Carrying out Control panels installation works;

Elektrownia Kozienice SA– DCS Automation systems modernization at the Unit 4;

Instytut Automatyki Systemów Energetycznch Sp. z o.o.– Control & Instrumentation systems and external cable routes installation works also supply of electrical equipment and cables for the Boiler OP-650-040 and the Turbine 13K2150 Kozienice Power Plant;

PSE Wschód SA– Internal road cleaning and external fence conservation activities within 220kV Distribution facility area of 220/110kV Station;

Polimex Mostostal S.A.– Turbine TG-4 Drainage system modernization;

 

2010

Sirius Engineers Sp. z o.o. – Delivery, prefabrication and assembly of measurement cubicles for exhaust flue gas desulfurization installation IOS II, recipient Kozienice Powerplant

Zakłady Azotowe Puławy SA – Works regarding measuring industry of the modernization task of the manufacturing oxygenition-ammonia-urea facility

Elektrobudowa SA – Assembly of control cables and electrica works for bl. 858MW, PGE Bełchatów Powerplant

Kozienice Powerplant SA – Modernization od DCS automation at block 7

Institute of Power Systems Automation Sp. z o. o. – “The work of disassembly and assembly of the wiring and equipment on the block No. 7 in Kozienice SA

ZA Puławy SA – “Installation of heating pipes to the task of rebuilding a node discharge of benzene and cyclohexanone”

Stalowa Wola SA power plant Tauron Group – “Modernization of the Water Treatment Plant – measurement and automation instrumentation for the industry”

Power Plant SA – “Repair Station próbopobieraków on Block No. 10”

Elektrobudowa SA – “Installation of electric heating in PTA plant in the construction of installations for the production of Terephthalic Acid in Anwil Wloclawek”

JTC SA – “Implementation of the instrumentation assembly Wet FGD Siekierki Power Plant – Stage I

Preci Poland – “Implementation of cable routes for the construction of weights in Kozienice”

Energoautomatyka Sp. z o. o. – “Dismantling the installation of instrumentation for the task Modernization of Control and Supervision Unit No. 6 at PGE Power Station

PSE East – “Implementation of repairing the facade, roof and drainage compressor building in SE 220/100kV Zamość”

ENVAG – “Implementation of cable connecting the container with the data points to analyze the gases in Kozienice”

Procom System SA – “The installation of the control room to the task of modernization carburizing (the node 31, 32, 33), PGE Power Station

Elektrobudowa SA – Electrical and I&C forks for etoxylation installations in Płock aranged for PCC Rokita”

APS Energy SA – „ Electrical works PGE Opole Powerplan”

2009

Stalowa Wola Power Plant Tauron Group – Work performance of I&C systems in scope of boiler OP150,K11 adoption for burning an excessive amount of biomass.

Instytut Automatyki I Systemów Energetycznych Sp. z o.o. – Modernizing turbine dynamic control tuning for Unit no.8, Kozienice Power Plant

Instytut Automatyki Systemów Energetycznych Sp. z o.o. – „Modernizing technological protection for Unit no.8, Kozienice Power Plant

Clyde Bergemann Poland Sp. z o.o. – „Implementation of communication between ash blowing cabinet and DCS system, Kozienice Power Plant

Energoautomatyka Sp. z o.o. – „Assembly of I&C systems for task Control System Modernization and Supervision Unit no.4 in BOT Bełchatów Power Plant

Kozienice SA Power Plant – Modernization of automation systems of Block No. 8 (basic and group sequence in DCS Ovation) in object part of the facilities and modernization of crossroom Block No. 8

Wratislavia-Bio Sp. z.o.o. – Electrical and I&C forks for Desmet Ballestrém installations to catalyst reduction in Biodiesel Production Plant Bio-Wratislavia Sp. z.o.o.

ELPAK Sp. z.o.o. – The implementation of works and supply of I&C associated with the project of Tz-12 turbine delivery to the combined heat and power station Zeran along with the design and associated works. I&C industry. “

Power Kozienice SA – Overhaul of water sampling station for Unit No. 8

Power Kozienice SA – The renovation works of units 8x200MW, 2x500MW and blockout facilities

Elektra K.I.A.E.iP. – Electric assembly works at EC Wrocław Port City

Elektroaparatura Sp. z.o.o. – Assembly work of electrical installation in the HM Głogów”

Institute of Power Systems Automation Sp. z.o.o. – Modernization of the dynamic control system of the turbine state (special measurements) Block No. 9 of the Power Kozienice

Power Kozienice SA – Overhaul of water sampling station for Unit No. 9

Pulawy Nitrogen Works SA – Works regarding measuring industry of the modernization task of the manufacturing oxygenition-ammonia-urea facility

APS Energia Sp. z.o.o. – Construction works, installation of air conditioning and cable for ODM and RCN PSE-South SA”

Power Kozienice SA – Replacing cables on the DC power supply block of the I&C control room No. 5 and 6

 

2008

Polimex Mostostal S.A – Performance of documentations, supply, accomplishment of assembly, after assembly tests, commissioning, implementation of the warranty service in terms of I&C systems – Implementation of the installation of electricity generation from renewable energy sources ( biomass ) in Białystok Combined Heat and Power Plant .

Instytut Automatyki I Systemów Energetycznych Sp. z o.o. – Apparatus and cabling assembly – Modernizing turbine dynamic control tuning for Unit no.6 , Kozienice Power Plant

Kozienice Power Plant S.A – Overhaul of I&C systems for Unit no.5, 6, and 10 as well as common auxiliaries

Kozienice Power Plant S.A – Overhaul of I&C system for Unit no.5

Emerson Process Management Power and Water Solution Sp.z o.o. – Assembly of flue gas opacity meter before exhaust gas purification installation – Ostrołęka Power Plant Group.

I&C Energa AS – Assembly of I&C systems for Unit no.8 Electrenai Power Plant Lithuania.

Kozienice Power Plant S.A – Modernizing of unit DCS. DCS sequence group of OVATION system for Unit no.6 in scope of unit auxiliaries.

Energomontaż – Północ S.A – Assembly I&C components for biomass belt conveyors in Białystok Combined Heat and Power Plant .

Kozienice Power Plant S.A – Overhaul of water sampling station for Unit no.6

Schneider Electric Polska Sp. z o.o. – Assembly of closed loop control cubicles with entrusted elements for OS Piaseczno.

APS Energia Sp. z o.o. – Performance of converters cables connections for Świnoujście Navy Port.

APS Energia Sp. z o.o. – Performance of 220 V DC Power plant general electrical auxiliaries with two electrical power suppliers PB220/100MS with entrusted materials.

Emerson Process Management Power and Water Solution Sp.z o.o. – Assembly of OVATION system as well as delivery and field installation of I&C elements – modernizing of gas oil firing warm-up burner for Kozienice Power Plant Unit no.5

Elektra K.I.A.E.iP. – Remaking of 0,4kV substation fields in Kawęczyn Combined Heat and Power Plant.

Stalowa Wola Power Plant Tauron Group – Work performance of I&C systems in scope of boiler OP150,K11 adoption for burning an excessive amount of biomass.

Kozienice Power Plant S.A – Overhaul of water sampling station for Unit no.4

Energoster Sp. z o.o. – Assembly of I&C electrical parts for Kozienice Power Plant Unit no.5

Kozienice Power Plant S.A – Assembly of control and fibre optical cables in 400kV channel duct . Connection between 200MW Units and Central Electrical Control Room.

 

2007

Polimex Mostostal S.A – Implementation of works in the electro- energy and technical industry, as well as electrical heating for “Building of Chemical Sulphate Production Plant – PCC Rokita Brzeg Dolny”

Kozienice Power Plant S.A -Unit no.3 – overhaul of water sampling station

Kozienice Power Plant S.A – I& C overhaul as well as auxiliary systems for Unit no. 1, 2,3, 7,8

Emerson Process Management Power and Water Solution Sp.z o.o.-Preparing and carrying out the work for modernizing of I&C and measurement systems on Unit no.3 Karlshamnverket Sweden

I&C Energo AS – Assembly of I&C systems – unit no.7 Elektrenai Lithuania

Polimex Mostostal S.A – Installation of I&C systems for production section. Delivery and assembly for warehouse of Building no.1 together with Profibus and fibre optical cables lay out for Methyl – Ester Acid Plant in “Wratislavia – Bio” Sp. z o.o.

Akwawit – Brasco S.A – Technical assistance for Desmet Ballaster during commissioning in Methyl – Ester Acid Plant in “Wratislavia – Bio” Sp. z o.o.

Energoautomatyka Sp. z o.o. – Assembly of I&C elements – modernizing of control and supervision systems for BOT Bełchatów Power Plant Unit no.3

Puławy Nitrogen Plant – Modernizing of Sulfuric Acid and Oleum installation.

Instal Kraków S.A – Assembly of electrical and I&C systems – modernizing of flue gas inlet to chimney no.1, flue gas channels of unit no.2 and 3 together with inlet connection to chimney no.2 in Kozienice Power Plant.

Kozienice Power Plant S.A – Overhaul of I&C system for Unit no.1

Instal Kraków S.A – Assembly works of electrical and I&C systems for the subject of refurbishment of cooling system of air compressor station no.1 (compressor TS04 ) based on air forced cooler system with automatic oil temperature control of air compressor TS04 in Kozienice Power Plant.

Kozienice Power Plant S.A – Overhaul of digital control systems of Unit no.1. DCS WDPF system – field side.

Kozienice Power Plant S.A – Overhaul of I&C systems for cogeneration porpose.

 

2006

Emerson Process Management AG – Switzerland – “Delivery and assembly of I & C of Unit No.3 REK BITOWA – Macedonia”

Emerson Process Management Power and Water Solutions Sp. z o.o. – “I/O object test checkout of steam and gas turbine of Unit No 1”- Thermal Power Plant IMANTA Latvia

Puławy S.A Nitrogen Plant – “Perform a measurement trade work for a task of Melamine Recycling Section ( MRS )”

Emerson Process Management Power and Water Solutions Sp. z o.o. “Replacement of armored capillary tubing thermometers and perform turbine leak-off rack installations- turbine – generator set Tz – A , Żerań Thermal Power Plant

Zdzieszowice” Sp. z o.o. Coking Plant – “Temperature measurements of riser pipes of battery no.11”

Puławy S.A Nitrogen Plant – “Perform a measurement trade work for a task of purchase and assembly of PO2 pumps for acid circulation inside the absorption column KO1”

“Kozienice” S.A Power Plant – “Modernization of air cooling installation of flame control system of light oil burners of steam boiler no.K9 ( 1650 t/h ) “

“Kozienice” Power Plant SA – “Complex modernization of I&C systems of power units no.1, 2, 3, 4, 6, 9 and common auxiliaries”

Elektrobudowa SA – “Delivery, assembly, and start up of I & C installation, task: �odernization of smoke conduit no.2 – “Kozienice” Power Plant SA “

Instytut Automatyki Systemów Energetycznych – “Assembly of measuring apparatus and local and external cabling for turbine supervisory measurements of power unit no.4 -“Kozienice” S.A Power Plant “

Elektrobudowa SA – “Delivery, assembly and set in motion of I & C installations . Task: Modernization of forced air water cooling towers located in “Kozienice” S.A Power Plant “

“Kozienice” S.A Power Plant – ” Water Cooling Pumps -Perform an automatic change over to self-lubrication “

Polimex Mostostal Siedlce – “Cabling assembly for fitting by-pass of hot outgoing district heat water and steam. Introduce into system 12 operating condition signals of UPS for new turbine – generator set Tz-A – “Żerań Thermal Power Plant”

Emerson Process Management Power and Water Solutions Sp. z o.o. – “Diagnostics and faults remove from I&C systems .Object: turbine – generator Tz-A technological system and degassers installation – Żerań Thermal Power Plant “

Procom System SA – “Assembly and disassembly work concerning a task: Replacement of compressor control system, object: Cooper Turbo – compressor TA – 48 located in compressor house in Department of ash removal – BOT Turow S.A Power Plant. “

“Kozienice” S.A Power Plant – “Assembly of air control installation for boiler AP-1650 safety valves”

“Kozienice” S.A Power Plant – “Overhaul of water sampling system of power unit no 2”

“Kozienice” S.A Power Plant – “Overhaul of I & C boiler protection systems connected with exhaust flue gas desulfurization installation IOS II of power units no.2 and 4”

“Kozienice” S.A Power Plant – “Overhaul of I & C systems of power unit no 9”

Zakłady Remontowe Energetyki Lublin S.A. – Zakład Kozienice – “Modernization of electrical and I & C systems. Make a furnishing of additional coolers located in compressor house no.2 “Kozienice” S.A Power Plant

Elektrownia Kozienice SA – “Supply of control devices indirect heating systems of power unit no.9 safety valves.”

I&C Energo AS – “Cabling arrangements and connections – Elektrenai Power Plant Lithuania �

Impact Automotive Technologies Sp. z o.o. – “Carry out assembly work of Battery-packs according to the given documentation.”

Elektra KIAEiP – “Assembly of optical fibers in “Kozienice” S.A Power Plant.”

Elektroaparatura Sp. z o.o. -“Assembly of I & C installations in Wielbark IKEA Sawmill”

Elektrownia Kozienice SA – “Perform measurement of electric quantities of unit auxiliaries switch houses P and K sections A and B for active island purpose.”

Elektrobudowa SA – “Perform of I & C work. Task: Gypsum transport system from IOS II to the main gypsum store located in ” Kozienice” S.A Power Plant.”

 

2005

Emerson Process Management Power and Water Solutions Sp. z o.o – “Delivery and assembly of whole I & C systems of turbine-generator set Tz-A� Thermal Power Plant – Żerań Poland

Mostostal Pulawy S.A – Development of fluid gases reloading terminal for TEZEZ Sp. z o.o I & C systems.

Power Industry Overhaul Factories Lublin S.A – Kozienice Factory – Modernization of electrical and I & C systems of Demineralization Station II located in ” Kozienice S.A Power Plant .

“Kozienice S.A Power Plant – Overhaul of I & C systems of power units no 2,4( 200MW)

“Kozienice S.A Power Plant – “I & C modernization connected with reduction of technical minimum to Pmin=110 MW in range of object parts works.

“Kozienice S.A Power Plant – “Overhaul of I & C systems of power units no:1, 7, 8, 9, 10 as well as auxiliary objects

Kingspan Sp. z o.o – ” Replace and development of existing automatic control systems operated on store of raw materials for productions “

Emerson Process Management Power and Water Solutions Sp. z o.o – Complex modernization of I & C systems of power units no.8 ( 200MW ) “Kozienice S.A Power Plant

SICK Sp. z o.o – Delivery, prefabrication and assembly of measurement cubicles for exhaust flue gas desulfurization installation IOS II, recipient “Kozienice S.A Power Plant .

Pulawy Nitrogen Plant S.A. – Assembly of measurement systems. Object: Industrial water filtrate systems of Adela cooling installation.

Remak Rozruch S.A – Finishing and complete works of I & C systems. Szamotuły Gas Press Sampling Station.

“Stalowa Wola S.A Power Plant – Modernization of measurements, I & C systems. Control of steam pressure of turbine bleed no.1 system, and amount of deminaralized water to steam condenser of TG no.6

“Kozienice S.A Power Plant – Modernization of DCS OVATION control desk and measurements cubicles of power unit no.8

“Kozienice S.A Power Plant – Overhaul of water sampling system of power unit no.5

SICK Sp. z o.o – Delivery and assembly of junction boxes with overvoltage protectors for exhaust flue gas desulfurization installation IOS II. “Kozienice S.A Power Plant

“Kozienice S.A Power Plant –Overhaul of WDPF system control cubicle of power unit n8

 

2004

Emerson Process Management Power and Water Solutions Sp. z o.o. – “Modernizacja AKPiA bloku Nr 5 i 6” w Elektrowni Kozienice SA

Elektrownia Stalowa Wola SA – “Modernizacja układów pomiarowych sterowania i automatyki branży AKPiA w celu dostosowania układu ciepłowniczego do potrzeb zintegrowanej regulacji EL. II”

Elektrim Megadex SA – Dostawa i montaż części akpia dla części przyturbinowej dla zadania “Modernizacja turbozespołu TG6 w Elektrowni Stalowa Wola”

Elektrownia Stalowa Wola SA – “Modernizacja układów pomiarowych sterowania I automatyki branża akpia kotłów K-10 i K-11”

Instytut Automatyki Systemów Energetycznych – “Montaż aparatury i okablowania na bloku nr 5 w Elektrowni Kozienice SA w zakresie Elektrohydraulicznego układu regulacji i sterowania oraz pomiarów specjalnych turbiny”

Elektrownia Kozienice SA – “Remont stacji próbopobieraków na bloku nr 5”

SICK Sp. z o.o. – Wykonanie prefabrykatów i wierceń w kominie dla zadania “Opomiarowanie emisji spalin w EC Stomil Olsztyn”

Przedsiębiorstwo Pomiarów i Automatyki “PiA-ZAP” – Montaż i dostawa materiałów branży AKP na zadaniu inwestycyjnym “Modernizacja i intensyfikacja Instalacji Melaminy I” – Etap I w Zakładach Azotowych Puławy SA

Elektrownia Kozienice SA – “Modernizacja centralnej sygnalizacji bloku nr 5”

SICK Sp. z o.o. – Wykonanie prefabrykatów i wierceń w kominie dla zadania “Opomiarowanie emisji spalin w PESC Częstochowa SA”

Siltec Sp. z o.o. – “Wykonanie pomiarów instalacji energetycznej w obiekcie HP Polska”

Elektrownia Kozienice SA – “Remont AKPiA bloków 1 10 oraz obiektów poza blokowych”

Hewlett-Packard Polska Sp. z o.o. –“Prace modernizacyjne Rozdzielni Głównej w Nowym Sękocinie”

 

2003-2001

Elektrownia Stalowa Wola SA – “Modernizacja układów pomiarowych sterowania i automatyki branży AKPiA kotłów K8 i K9”

Procom-System SA (na zlecenie Simens Niemcy) – “Układanie kabli i łączenie w szafach w EC Wilno”

Elektrownia Kozienice SA – “Modernizacja palników gazowych blok nr 3 z dostosowaniem ich do istniejących palników olejowych”

Polska Telefonia Cyfrowa Sp. z o.o. – “Budowa wewnętrznych linii zasilających w 20907 – zasilanie siłowni nr 2”

Zakładach Azotowych Puławy SA – “Montaż układów pomiarowych, Obiekt: Węzeł filtracji roztworu mocznika D-115A”

Zakładach Azotowych Puławy SA – “Montaż okablowania urządzeń AKPiA Wytwórnia Melaminy III. Chłodnie Wentylatorowe”

Elektrownia Kozienice SA – “Modernizacja AKPiA związana z obniżeniem minimum technicznego bloków nr: 2, 6, 7 do Pmin=110MW w zakresie wykonawstwa części obiektowej”

Elektrownia Kozienice SA – “Modernizacja AKPiA obrębie pomiarów i sterowań kotła związanych z wymianą zaworów wtryskowych i rozruchowych na bloku nr 1”

ICS Polska Sp. z o.o. – “Instalacje elektryczne i AKPiA dla systemu podajników w Elektrociepłowni Firmy Black Red & White w Biłgoraju”

Firma Handlowo-Usługowa “Margo” – “Instalacje elektryczne w budowanym Zakładzie Konfekcjonowania Drobiu w miejscowości Garbatka Długa”

Polska Telefonia Cyfrowa Sp. z o.o. – “Przygotowanie instalacji zasilającej dla platformy IN6”

Techmatrans SA – “Prace montażowe instalacji elektrycznych na budowie Volkswagen Poznań”

Elektrownia Kozienice SA – “Remont AKPiA bloków 1 10 oraz obiektów poza blokowych”

Elektrownia Kozienice SA – “Wymiana rur impulsowych na pomiarach podciśnienia i różnicy podciśnienia w komorze paleniskowej kotła bloku nr 10”

APS Energia Sp. z o.o. – “Wykonanie prac montażowych na stacji “Karolinka” RE Piotrków Trybunalski”

Elektrownia Kozienice SA – “Oznakowanie na bloku nr 2 kabli automatyki i pomiarów turbiny i kotła oraz kabli sterowniczych napędów 6 kV, 0,4 kV na kotle”

 

downloadcatal

downloadcatal

Contact


 

ENAP S.A.

Wilczkowice Górne 41, 26-900 Kozienice

read-more

ENAP S.A. Northern region of Poland

Amber Tower, Szafarnia 10/24 Street, 80-755 Gdańsk

read-more

ENAP S.A. Southern region of Poland

Porcelanowa 10 Street, room. 2, 40-246 Katowice

read-more

.

 

.

 

 

SEARCH

                       NAVIGATION

                 MARKET

    OUR ACTIVITIES INCLUDE

..

..

..

                        » Our offer

                        » News

                        » Work

                        » References

                  » Industry

                  » Paper

                  » Power engineering

                  » Chemical

     » Preparation of project documentation

     » Gathering of required equipment

     » Producing of prefabricates

     » Delivery of materials and installation

     » Programming of control drivers

     » Conducting of adjustment

     » Mechanical and technological start-up

     » Preparation of project documentation

.

.

Firma ENAP S.A. uzyskała dofinansowanie z Unii Europejskiej ze środków Europejskiego Funduszu Rozwoju Regionalnego oraz z budżetu państwa na realizację projektu w ramach działania 1.5 RPO WM 2007-2013, pt: „Budowa oraz unowocześnienie zaplecza produkcyjno-usługowego na potrzeby uruchomienia produkcji urządzeń elektroenergetycznych wykorzystujących odnawialne źródła energii oraz usług w zakresie badań certyfikacyjnych”. Informacje źródłowe na temat Regionalnego Programu Operacyjnego Województwa Mazowieckiego 2007-2013 znajdują się na stronie: www.mazowia.eu