References


 

2022

Trumpf Huettinger Sp. z o.o.  – „Assembly works on TRUMPF devices”

ENEA Serwis Sp. z o.o.  – „Repair works of the control and measurement equipment on block and off-block facilities of the power plan in 2022”

ENEA Wytwarzanie Sp. z o.o. – „Provision of maintenance services in the field of electric heating of pipelines, heating heaters, electrical measurements and periodic inspections of power units in 2022 in ENEA Wytwarzanie Sp. Z o.o. in Świerże Górne””

ENEA Wytwarzanie Sp. z o.o. – „Modernization of 0,4kV ROT-A, ROT-B switchgears and cable ducs in ENEA Wytwarzanie Sp. Z o.o. in Świerże Górne”

AS Technologie SP. z o.o. – „Implementation of deliveries and electrical works as well as I&C in the Estrów Building in ZAK – Modernization of the cooling system”

Uniserv S.A. – „Design, delivery, assembly and commissioning of a wet, four-cell cooling tower in a prefabricated reinforces concrete structure”

ATK Montage UG  – „Provision of staff for electrical installation works in a hotel and office building”

Valmet Technologies Oy – „Delivery of electrical and I&C installation in Braunschewig Germany”

ZPAS S.A.– „Modernization of instrumentation and measurement equipment of ZR 1-3 ash retention tanks at ENEA Wytwarzanie Sp. Z o.o. in Świerże Górne”

ABB Sp. z o.o. – „Execution of assembly works in the field of automation for the project of connecting DCS Systems in PGE Toruń”

ENEA Wytwarzanie Sp. z o.o – „Modernization of the DCS Automation at block no.6 and 10 in terms of the facility part in ENEA Wytwarzanie Sp. Z o.o. in Świerże Górne”

Polimex Mostostal S.A. – „Comprehensive performance of works in the I&C sector of the Newly Built Power Unit based on coal fuel at GA ZAP Puławy”

CSI Europe Sp. z o.o. – „ Execution of works related to the construction of electrical installations, including: construction of cable lines, assembly of lighting poles”

EMERSON PROCESS MANAGEMENT SP. Z O.O. – “ Execution of network and server cabinets for the construction of the Newly Built Block at GA ZAP Puławy””

Ferox Automation Sp. z o.o. – “ Delivery and assembly of a system for high-efficiency production of electricity and heat combined with a flue gas cleaning system enabling CO2 fertilization of crops for Polskie Pomidory S.A, Ryczywół”

Elektrociepłownia Stalowa Wola S.A. – „Provision of services and maintenance works in the I&C and electrical industries”

Zakłady Remontowe Energetyki Katowice S.A. – „Replacement of the OFA damper control systems in connection with the modernization of the boiler of unit no. 6 in ENEA Wytwarzanie Sp. z o. o. in Świerże Górne”

EMERSON PROCESS MANAGEMENT SP. Z O.O.
“ Works on site including prefabrication, disassembly and assembly, performance of checks and participation in start-up at Elektrociepłownia Stalowa Wola”

ACE Instal Sp. Z o.o. – „Inventory and marking of cables within 200MW blocks in ENEA Wytwarzanie Sp. z o. o. in Świerże Górne”

ENEA Wytwarzanie Sp. z o.o. – „Construction of the MV power supply system from the ENEA Kozienice power plant to the production plant in Ryczywol – Polskie Pomidory”

ENEA Wytwarzanie Sp. z o.o.  – „Repair of the 3HTW20 (IOS III) sealing air set at ENEA Wytwarzanie Sp., z o.o. in Świerże Górne”

ENEA Wytwarzanie Sp. z o.o. – „Modernization of measuring stubs on flue gas ducts of Unit 11 in ENEA Wytwarzanie Sp. z o. o. in Świerże Górne”

Clyde Bergemann Polska Sp. z o.o. – „Delivery and assembly of cabling along with cable routes for the installation of acoustic blowers of the reserve layer of the SCR reactor in accordance with the submitted design”

ELIN Sp. z o.o. – „ Modernization works of the C21 substation switchboards for the construction of the 2nd Line of the Warsaw Metro”

ENEA Serwis Sp. z o.o. – „Modernization of the DCS automation at unit no. 7 and 9 in the field of the facility part in Enea Wytwarzanie Sp. z o. o. in Świerże Górne”

2021

Mitsubishi Hitachi Power Systems Europe GmbH – Electrical installation and I&C systems works, adaptation of the existing local low voltage switchgears to DCS systems at the Heat and Power Plant facilities in Gdańsk, Kraków, Wrocław and Gdynia.

Bertsch Energy GmbH – Execution of I&C systems installation together with materials delivery at the Paper Mill in Kemsley, Great Britain.

ENEA Wytwarzanie sp. z o.o. – Modernization of cable installations from measuring systems E5B9, E5B10 to IOS I and IOS III installations and assembly of two switchboards for measuring containers on Unit Block No. 9 and 10 in Świerże Górne.

Grupa Azoty Polskie Konsorcjum Chemiczne sp. z o.o. – Performance of I&C systems installation for the task: „Modernization of the Kortowo Heating Plant – Słoneczna 46 in Olsztyn – in order to adapt to the emission standards resulting from the IED Directive and BAT Conclusions”.

IASE sp. z o.o. – „Cable and accessories delivery and installation on Unit Block No. 8 in Kozienice Power Plant”, ENEA Wytwarzanie sp. z o.o., Świerże Górne.

Enea Serwis sp. z o.o. – I&C renovation works of the Power Plant Unit Blocks in 2021-2023 in ENEA

Wytwarzanie sp. z o.o., Świerże Górne.

ELIN Sp. z o.o. – Prefabrication of the low voltage switchgears „Bródno C21 Metro Station” in Warsaw.

ZRE Katowice S.A. – „Modernization of the TG-3 turbine set in Kozienice Power Plant”, ENEA Wytwarzanie sp. z o.o. in Świerże Górne.

SUMITOMO SHI FW Energia Polska sp. z o.o. – Cabling supply and installation for the ACI tank detection system in Żerań CHP Plant.

Enea Serwis Sp. z o.o. – Renovation works of the I&C systems installation in Świerże Górne in 2021.

SEMAKO sp. z o.o. – „Modernization of the Sewage Treatment Plant from the Wet Flue Gas Desulphurization Installation at the Siekierki CHP Plant in Warsaw – assembly works related to the modernization of the sewage treatment plant”.

AIUT sp. z o.o. – Execution of electrical installation for the PBS area and Water Test & Inspection line in the project X250 Opel, Gliwice.

Mercon-Serwis – Performance of installation works on the ANWIL Włocławek site.

AIUT sp. z o.o. – Execution of assembly works in the field of Automation on the production line of BMW Plant in Greer, USA.

Sterenergo Projekt sp. z o.o. – Electrical works related to the implementation of the Investment task under the name „Construction of a surface air-conditioning station (PSK) working in a trigeneration system on the GG-I shaft area” at the Polkowice CHP Plant.

Elektrociepłownia Stalowa Wola S.A. – „Provision of I&C services and maintenance works, including service, inspections, maintenance of devices, control and measurement devices and I&C installations as well as devices and electrical installations in the field of secondary circuits in the gas and steam block (BGP), cooling water pumping station, water treatment and demineralization station (SUW, DEMI) and gas boiler room (RZC) in the I&C and electricity industry ”in Stalowa Wola CHP Plant.

Narodowe Centrum Badań Jądrowych – Reconstruction of the OPT-6 distribution board for the purposes of powering the building 81 under construction at the headquarters in Otwock.

ENEA Wytwarzanie sp. z o.o. – „Provision of maintenance services in the field of electric heating of pipelines, heating heaters, electrical measurements and periodic inspections of Unit No. 11 in 2021-2024 for ENEA Wytwarzanie sp. z o.o. “.

TRUMPH HUETTINGER Sp. z o. o. – Installation of control and power cabinets, power electronic devices and prototypes. Technical support of the installation and documentation at the Trumph headquarters in Zielonka.

Rolf Janssen GmbH – Installation, repair and modification services for the Żerań Power Plant.

ENEA Wytwarzanie sp. z o.o. – Construction works: „Modernization of the 0,4kV ROT-A, ROT-B distribution board and cable ducts in ENEA Wytwarzanie sp. z o.o., Świerże Górne”, as part of the project Id I9040M0196.

AIUT sp. z o.o. – Electrical installation services in PSA Manufacturing Poland Gliwice.

ENERGOCAD – „Performance of works on the IOS I oxidation air pipelines at the Kozienice Power Plant ” in the Świerże Górne location.

AS Technologie Sp. z o.o. Sp. k. – Execution of electrical works and I&C systems installation in the Estrów Building under the investment project „Modernization of the cooling system”, Chemical manufacturer Grupa Azoty ZAK S.A. in Kędzierzyn-Koźle.

RAFAKO S.A. – Service works in the Area of SCR installation Unit K9 and K10 in ENEA Wytwarzanie sp. z o.o., Świerże Górne.

UNISERV S.A. – Execution of electrical and I&C systems installation as part of the Task entitled: „Design, delivery, assembly and commissioning of 4-cell fan coolers in a prefabricated reinforced concrete structure” as part of the Project: „ Construction of a Power Unit based on coal in Puławy” in Zakłady Azotowe “Puławy” S.A.

Emerson Process Management sp. z o.o. – Deliveries, prefabrication and installation of the cabinet on the CHP Stalowa Wola premises.

ENEA Serwis Sp. z o.o. – Provision of the service „Installation of a heat meter supplied to an external recipient „Citronex” for ENEA Wytwarzanie sp. z o.o.”.

Akila sp. z o.o. – Prefabrication of boxes together with the delivery of cables in Z.A. „Puławy”.

Energopomiar sp. z o.o. – Performance of I&C systems installation and electrical works on the sewage treatment plant installation IOS V at ENEA Wytwarzanie sp. z o.o. in Świerże Górne location.

AIUT sp. z o.o. – Installation works in the field of Automation on the production line in the BMW Dingolfing Plant, Germany.

ATK MONTAGE UG – Electrical installation works in the hotel and office building in Berlin, Germany.

Valmet Technologies Oy – Performance of electrical and I&C systems works for the BFB boiler in the Heizkraftwerk-Mitte CHP Plant in Braunschweig, Germany.

ORLEN Serwis S.A. – PTA installation works in the PIA industry in ANWIL Włocławek.

ZPAS S.A. – Execution of electrical and I&C systems installation of retention tanks ZR-2 and ZR-3 in ENEA Wytwarzanie sp. z o.o., Świerże Górne.

Gmina Kozienice – Implementation of sports lighting on the Głowaczowska 33 Street in Kozienice with the selection of lighting fixtures and as-built measurements.

DOOSAN Babcock Energy Polska S.A. – Thermocouple delivery and replacement in ENEA Wytwarzanie sp. z o.o. in the Świerże Górne location.

ABB sp. z o.o. – Assembly works in the field of electrical engineering and I&C systems, switching and commissioning of I&C in the DCS GT-50 system in PGE Toruń S.A.

ENEA Wytwarzanie sp. z o.o. – Modernization of DCS automation on Units 6 and 10 in ENEA Wytwarzanie sp. z o.o., Świerże Górne.

Doosan Lentjes GmbH – Installation of the I&C system related to trace heating of pipeline vapor channels to the A and B hydrator lines, regulatory activities in the DCS system, detailed design of the I&C and electrical scope at the Pomorzany Power Plant facility.

CSI Europe sp. z o.o. – Performing works related to the construction of electrical installations, including with the construction of cable lines and lighting poles installation at the “Construction of the C20 Metro Station” investment in Warsaw.

Emerson Process Management sp. z o.o. – Delivery and assembly of network and server cabinets in Z.A. “Puławy” S.A.

Ferox Automation sp. z o.o. – Execution of electrical installations and Automation as part of the investment entitled „Supply and installation of a highly efficient electricity and heat production system in combination with a flue gas cleaning system enabling CO2 fertilization of crops. Location of the investment task – Polskie Pomidory S.A., Ryczywół, 26-900 Kozienice”.

2020

Polimex-Energetyka Sp. z o. o. – Performance of I&C systems installation and DCS works under the investment “Construction of a semi-dry Flue Gas Desulphurization Installation with a dry ash distribution installation for two Benson OP-206 boilers at the Pomorzany – Szczecin Power Plant”.

Enea Serwis Sp. z o. o. – Renovation works of the I&C systems installation in Świerże Górne in 2020.

Emerson Process Management Sp. z o. o. – Prefabrication of a server and network cabinet for the Gas-Steam Block, supplementing I&C works at the Gas Reduction Station at the Żerań CHP Plant.

Emerson Process Management Sp. z o. o. – Supervision of site works on the construction site of Unit J910 in Jaworzno.

ZRE Katowice S.A. – Delivery and replacement of mazut burners according to the CBKK Tarnowskie Góry documentation on the boiler No. 7 and No. 2 in ENEA Wytwarzanie Sp. z o. o. in Świerże Górne.

OMC ENVAG Sp. z o. o. – I&C systems installation works for “Adaptation to BAT conclusions IOS IV (chimney 6), IOS II Outlet (chimney 4), chimney 5 bl. 10 and block 11 for the monitoring of NH3, HCL, HF and Hg in ENEA Wytwarzanie Sp. z o. o. ” in Świerże Górne.

TRUMPH HUETTINGER Sp. z o. o. – Installation of control and power cabinets, installation of power electronic devices, installation of prototypes. Technical support for the assembly and documentation of control cabinets and power devices at the Trumph headquarters in Zielonka.

AIUT Sp. z o. o. – Execution of electrical and I&C systems installation at BMW plants in Dingolfing, Germany.

ELEKTROBUDOWA S.A. – Comprehensive performance of electro-assembly works on the premises of Stalowa Wola Heat and Power Plant.

ABB Sp. z o. o. – Execution of cable connections of the 0.4 kV power supply system and K1 intermediate boxes together with electrical measurements and disassembly of old cables for CIECH Soda Polska S.A. in Inowrocław.

ENEA Wytwarzanie Sp. z o. o. – Modernization of DCS automatics in Unit No. 1, 4 and 5 in terms of the object part and modernization of the Automatic Fire Extinguishing System in RP-1043x coal mills on Unit No. 10 in ENEA Wytwarzanie Sp. z o. o. in Świerże Górne.

Clyde Bergemann Polska Sp. z o. o. – Execution of electrical and I&C systems installation for the K5 boiler ash blowers in ENEA Wytwarzanie Sp. z o. o. in Świerże Górne.

PGE Górnictwo i Energetyka Konwencjonalna S.A. – Delivery and installation of cable routes for the HVAC control system as part of the task “Construction of the New Block carburization facilities at PGE GiEK S.A. Turów Power Plant Branch “.

AGAT S.A. – Implementation of assembly works in the field of electrical engineering, I&C systems and video monitoring for tanks No. 140, 175, 180 and 190 in the scope related to the implementation of the investment project entitled: “Oil Terminal in Gdańsk – Stage II. PSP element: I-12/016 ”.

Enea Serwis Sp. z o. o. – Replacement of cable routes in the IOS I area, as part of the investment project I9030M0063 with technical documentation in ENEA Wytwarzanie Sp. z o. o. in Świerże Górne.

IASE Sp. z o. o. – Installation of cable routes in ENEA Wytwarzanie Sp. z o. o. in Świerże Górne.

 

ZRE Katowice S.A. – Delivery and replacement of thermocouples on metal measurements during the renovation of K5. Delivery and replacement of pneumatic actuators during the renovation of the K5 boiler in ENEA Wytwarzanie Sp. z o. o. in Świerże Górne.

AIUT Sp. z o. o. – Execution of assembly works at the facility of Jaworzno III Power Plant.

ENEA Wytwarzanie Sp. z o. o. – Power supply and automation for backflow preventer for PC 5, PC 6 cooling water pumps for 200 MW Units in ENEA Wytwarzanie Sp. z o. o. in Świerże Górne.

Rolf Janssen GmbH – Service and supply representation of Rolf Janssen GmbH in the field of installation, repair and modification for Żerań Power Plant.

Mitsubishi Hitachi Power Systems Europe GmbH – Electrical installation and I&C systems works, adaptation of the existing local low voltage switchgears to DCS systems at the Heat and Power Plant facilities in Gdańsk, Kraków, Wrocław and Gdynia.

Akila Sp. z o. o. – Performing post-assembly tests and tests of signals from the field apparatus to the DCS system for the FGD installation of Unit No. 7 in Turów Power Plant.

Elektrociepłownia Stalowa Wola S.A. – Provision of I&C services and maintenance, including service, inspections, maintenance of devices, control and measurement devices and I&C systems installation on the premises of the Gas and Steam Unit, Cooling Water Pumping Station in Heat and Power Plant Stalowa Wola S.A. and RZC.

SBB Energy S.A. – Disassembly and assembly works as part of the implementation of the task –  Migration of the DCS system in Units No. 2 and No. 5 at the Gdańsk Heat and Power Plant.

ORLEN Serwis S.A. – I&C assembly works at the PTA facility in Anwil Włocławek, ORLEN Group.

Emerson Process Management Sp. z o. o. – Performance of I&C systems installation and electrical works in Żerań CHP Plant.

Valmet Technologies OY – Electrical lighting installations at the facilities of CIECH Soda Polska S.A. Inowrocław and Janikowo.

ACE Install Sp. z o. o. – Performing works and deliveries in the field of I&C systems under the procedure called “Modernization of cooling water pumps for 200 MW Units” at ENEA Wytwarzanie Sp. z o. o. with headquarters in Świerże Górne ”.

Enea Serwis Sp. z o. o. – Installation of temperature measurements in the combustion chamber of Unit Block No. 11 at ENEA Wytwarzanie Sp. z o. o. in Świerże Górne.

Emerson Process Management Sp. z o. o. – Performance of I&C systems installation on the Construction Site of the new built Turów Power Plant.

ENERGOSTER Sp. z o. o. – Installation works as part of the task “Modernization of TG-4 and TG-5 turbine sets at Kozienice Power Plant”.

Bertsch Energy GmbH – Installation and assembly works of the I&C systems together with the delivery of materials at the Paper Mill in Kemsley, Great Britain.

ENEA Wytwarzanie Sp. z o. o. – Performance of works related to the location and repair of a damaged 15kV cable at the location of ENEA Wytwarzanie Sp. z o. o. in Świerże Górne.

 

Elektromontaż-Poznań S.A. – Delivery of electrical equipment and materials as well as assembly and installation works as part of the investment “Construction of the Gas and Steam Unit of EC Żerań”.

ENEA Wytwarzanie Sp. z o. o. – Execution of metering for the main pumping station for rain-industrial wastewater in 200 MW Units in the field of electricity in ENEA Wytwarzanie Sp. z o.o. – Kozienice Power Plant.

Doosan Lentjes GmbH – Installation of the I&C system related to trace heating of pipeline vapor channels to the A and B hydrator lines, DCS system regulatory activities, detailed design of I&C and electrical scope at the Pomorzany Power Plant facility.

2019

AIUT Sp. z o. o. – Execution of electrical works at the Radomsko Ardagh Metal Beverage Trading Poland

Sp. z o. o. production line and distribution board installation at the Aiut production line in Gliwice.

AGP Metro Polska. ASTALDI S.p.A., Gülermak A.S. Spółka Cywilna – Distribution boards prefabrication for Warsaw Underground Stations: Szwecka-Targówek-Trocka and Płocka-Młynów-Księcia Janusza.

Clyde Bergemann Polska Sp. z o. o. – Comprehensive electrical installation and I&C systems installation for Ash Blowers Installation, Boiler K2, K7 in Kozienice Power Plant

ZRE Katowice S.A. – Execution of installation works for the Turbogenerator and Boiler Unit No. 2. Delivery and replacement of Mazut Burner installations on Units No. 2, 7 in Enea Wytwarzanie Sp. z o. o.

ENEA Serwis Sp. z o .o. – Modernization of DCS Automation of Units No. 2, 7 in the field of facilities in Świerże Górne, Kozienice Power Plant.

PGE Dystrybucja Oddział Lublin – Supply of Shark and Nexus energy quality analyzers for power stations: Chruślina, Parczew, Oboźna, Opole Lubelskie, Łosice, Poniatowa.

Energoster Sp. z o. o. – Installation works as part of the task „Modernization of turbine Unit No. 7, 2 in Kozienice Power Plant”.

Emerson Process Management Sp. z o. o. – Delivery and installation of system cabinets in Stalowa Wola, CHP Plant.

ETP S.A. – Electrical installation works related to cable routes construction, control and power cables system for the task „Supply of WTR Furnace and Foundry Machine in Legnica Copper Smelter”.

Budimex S.A. – Local control boxes prefabrication for the new Power Unit in Turów Power Plant.

IASE Sp. z o. o. – Installation works in the field of I&C systems on the Unit block No. 7 in Kozienice Power Plant.

Emerson Process Management Sp. z o. o. – Installation works for DCS burner installation on the Unit block No. 2 in Kozienice Power Plant.

Aster Resovia Sp. z o. o. – Expansion of low-voltage BKG distribution board at the ITPOE Rzeszów facility.

OMC ENVAG Sp. z o. o. – Performance of I&C systems installation of SCME system for SCR K9 in Kozienice Power Plant.

Technopomiar Sp. z o. o. – Replacement of gas detection system and installation of styrene detectors and optical-acoustic signaling device, Ashland.

ENEA Serwis Sp. z o. o. – Modernization of the automatic fire extinguishing installation in coal mills on Unit No. 9 in Enea Wytwarzanie Sp. z o. o., Świerże Górne.

Energotest Sp. z o. o. – Performing installation and construction works related to the replacement of the reserve system Unit Block 200 MW in Kozienice Power Plant.

Aster RESOVIA TM.E. S.p.A. Termomeccanica Ecologia Astaldi S.p.A. spółka cywilna – Modernization works of the BKG distribution board – Stage II – Modernization at PGE GiEK SA , CHP Rzeszów.

PROCOM System S.A. – Assembly works in the field of Engine Room at TAMEH Kraków.

AIUT Sp. z o. o. – Execution of electrical works and I&C systems installation on the BMW production line in Wolfsburg and Braunschweig, Deutschland.

OMC ENWAG Sp. z o. o. – I&C systems installation for the task „ Adaptations to the BAT conclusions IOS IV; IOS II Outlet; Unit Block No. 9 and 10, Cooling Tower Unit Block No. 11 in Enea Wytwarzanie Sp. z o. o. “.

TRUMPH HUETTINGER Sp. z o. o. – Installation of control and power distribution boards, installation of power electronics devices and prototypes, Zielonka.

SBB Energy S.A. – Installation works in the scope of the I&C systems as part of the task „Migration of the DCS system of Unit Block No. 2 and 5 , CHP Gdańsk” – Boiler No. 2.

Q-ELEKTRIK a.s. – Electrical and installation works in BorsodChem MCHZ Ostrava, Czech Republic.

Emerson Process Management Sp. z o. o. – Installation works related to the Path Boxes Prefabrication of Ovation System, CHP Żerań.

ELEKTROBDOWA S.A. –  „Electrical and installation works for the Pumping Station on the San river” , CHP Stalowa Wola.

AMSET Group s.r.o. – Execution of electrical works in AMSET Group s.r.o. – Aluminum Plant Konin.

ABB Sp. z o. o. – Execution of cable connections for the 0.4 kV power supply and control system for the K3 Boiler along with electrical measurements and cable disassembly at the Ciech Soda Polska S.A. facility , Inowrocław.

AKILA Sp. z o. o. – Commissioning works of FGDP installations in Ugljievik Power Plant, Bosnia and Herzegovina.

Enea Wytwarzanie Sp. z o. o. – Replacement of rectifiers PT-C of the Unit Block No. 4,6,7.

Elektrociepłownia Stalowa Wola S.A. – „Replacement of AUMA drives as part of control standards unificationˮ ;  CHP Stalowa Wola.

ZRE Katowice S.A. – Inspection and maintenance of the rail bridge as well as the purchase and replacement of power circuits of the TG4 turbine rotator,  G.A.  Z.A. Puławy.

ENERGOAUTOMATYKA Sp. z o. o. – Completion of electrical installation works included in the subject of the task „Boiler Room Construction in Tauron Wytwarzanie S.A.” .

ABB Sp. z o. o. – Execution of cable connections for the 0.4 kV power supply system and K1 intermediary boxes together with electrical measurements at the Ciech Soda Polska S.A. facility in Inowrocław.

ETP S.A. – Performance of electrical and I&C system installation works under the investment „ Construction of the Malczyce barrage on the Odra River”

Clyde Bergemann Polska Sp. z o. o. –  Supply and assembly of water cannon installations K6 in Kozienice Power Plant.

Q-ELEKTRIK a.s. – Electrical and installation works at the Mondi Steti facility, Czech Republic.

Enea Serwis Sp. z o. o. – „Renovation works of the I&C systems installation at the Świerże Górne facility in 2019ˮ.

ZPAS S.A. – Site works of SW Segment 1 at Kozienice Power Plant.

Grupa Azoty Zakłady Azotowe „Puławy” S.A. – Performance of I&C systems installation on the construction of a new Granulated Fertilizer Plant based on Ammonium Nitrate, Z.A. Puławy.

Valmet Automation Sp. z o. o. – Works on the IOS Installation in Enea Wytwarzanie Sp. z o. o.

AIUT Sp. z o. o. – Execution of installation works in the field of Automation on the production line of BMW Plant Dingolfing, Germany.

Emerson Process Management Sp. z o. o. – Prefabrication of server and network distribution board for the Gas-Steam Block in Żerań CHP Plant.

Sterenergo Projekt Sp. z o. o. – Installation works for the Construction of a comprehensive I&C installation in Jaworzno III (part of the Engine Room).

Ashland Specialties Poland Sp. z o. o. – Electrical and pneumatic installation of the TK102 tank, Miszewo.

ZRE Katowice S.A. – Performance of electrical works of Tubine set Unit Block No 10 in Enea Wytwarzanie

Sp. z o. o., Świerże Górne.

Polimex Energetyka Sp. z o. o. – Construction and assembly works for the task „Construction of a semi-dry Flue Gas Desulphurisation Installation (FGDP) together with a dry ash Distribution Installation for two Benson OP-206 Boilers”, Pomorzany Power Plant, Szczecin.

ZRE Katowice S.A. – „Electrical installation of modernized systems in Enea Wytwarzanie, Unit Block  No 10″, Kozienice Power Plant.

2018

AIUT Sp. z o. o. – Execution of electrical works and I&C installations in metal packaging factory in Rugby, Great Britain

ETP S.A. – Implementation of I&C Systems and teletechnical installation under the investment „ Construction of the Malczyce barrage on the Odra River”

INTEC Sp. z o. o. – Assembly works related to I&C systems installation for heavy oil system modernization in Kozienice Power Plant

PROCOM Sp. jawna – Delivery, disassembly and assembly works of the electrical parts and I&C system during the modernization of the Unit block No 6 in Kozienice Power Plant

Elektro Poltramp Yard S.A. – Implementation of the assembly-electrical works on units Fluctus F5006 and F5008 in Świnoujście

OMC ENVAG Sp. z o. o. – Execution of the cable routes under heating probe for CEMS container SCR Installation of K4. P348, Inowrocław

Elbudbis Sp. z o. o. – Execution of Automatic strain relief, Power Distribution Room 220kV SE Kozienice in Enea Wytwarzanie Sp. z o. o.

Enea Wytwarzanie Sp. z o. o . – Modernization of the sampling and cooling water supply system of the physico-chemical measurement system on the Unit No 9 in Kozienice Power Plant

Energoster Sp. z o. o. – Execution of assembly work within the framework of the project “Modernization of the electronic turbine control” on the Unit No 6 in Kozienice Power Plant

Enea Serwis Sp. z o. o. – Modernization of DCS Automation on the Unit No  6 and 9 for part of object in Świerże Górne

AIUT Sp. z o. o. – Execution of assembly works in the field of Automation on the Volkswagen production line in Hannover, Deutschland

Elektro Poltramp Yard S.A. – Electrical works on Units : Mariaburg and Marschenland in Świnoujście

Enea Serwis Sp. z o. o. – Renovation works on the I&C Installation in Świerże Górne

Elektrobudowa S.A. – Comprehensive implementation of cable routes on the Lotos PetroBaltic Site , Gdańsk

Clyde Bergemann Polska Sp. z o. o. – Comprehensive electrical installation for ash blowers installation, Boiler K6 in Kozienice Power Plant

Boccard Polska Sp.  z o. o. – Implementation of impulse routes of I&C circuits in the area of Zabrze Thermal Power Plant

AIUT Sp. z o. o. – Execution of site works in the FCA Poland, Tychy

Wakro – Execution of cable routes and laying of wires for the active carbon system, Zabrze Thermal Power Plant

Elektro Poltramp Yard S.A. – Electrical works on the Unit COPERNICUS – passenger-car ferry, Świnoujście

IASE Sp. z o. o. – Execution of the equipment assembly along with the delivery of cables and assembly accessories on the Unit No 6 in Kozienice Power Plant

Astaldi S.p.A s.c. – Modernization of the main low-voltage switchgear of own needs No BKG along with the delivery of materials, installation work and commissioning in the PGE GiEK SA, Rzeszów Thermal Power Plant

ZPAS S.A. – Assembly and installation works in the field of I&C in Kozienice Power Plant

Orlen Serwis S.A. – Implementation of electrical and I&C works in the chemical company Anwil S.A., Włocławek

AIUT Sp. z o. o. – Execution of assembly works in the field of Automation on the BMW production line in Deutschland

Doosan Babcock Energy Polska S.A. – Electrical and I&C works related to Boiler modernization K-9 in Kozienice Power Plant

Enea Wytwarzanie Sp. z o. o. – Execution of the measurement of the Unit 11 Boiler in the field of electricity consumption in Kozienice

Eltel Networks Energetyka S.A. – Assembly works related to cable replacement 15kV in SE Kozienice

IGLOTEX S.A. – Installation of the main fire alarm switch in medium voltage switchgear, IGLOTEX S.A.
in Skórcz

SBB Energy S.A. – Performance of electrical and I&C system installation works as part of the project „ Commissioning of non-technological switchboards on the Block Unit No. 11” in Kozienice Power Plant

Valmet Technologies – Performing disassembly works for the electrical part in CIECH Soda S.A., Janikowo

ABB Sp. z o. o. – Installation works along with commissioning in PCC Rokita

OMC ENVAG Sp. z o .o. – Control & Instrumentation installation works of SCME system for SCR Installation K10 in Kozienice Power Plant

Doosan Babcock Energy Polska S.A. – Performance of electrical and I&C system installation works related

with „Replacement of ash blowers for cleaning the Boiler’s front end AP-1650 K10 in Kozienice Power Plant

Phoenix Contact Sp. z o. o. – Prefabrication of automation cabinets IEC 61850 on the Block Unit No 11 in Kozienice Power Plant

Enea Wytwarzanie Sp. z o. o. – Service performance.: „Installation of a cooling system for samples of physicochemical measurements on Blocks 8×200 MW”, Kozienice Power Plant

ASHLAND Specialties Polska Sp. z o. o. – Electrical installation of storage tanks, Miszewo

ALSTAL Grupa Budowlana – Execution of electrical facility works with the delivery of materials and prefabrication of low voltage switchgear with foundation and connection to the facility in Zakład Ubezpieczeń Społecznych, Warszawa

 

2017

RAFAKO – „Complete performance of work related to I&C systems installation for Selective Catalytic Reduction system (SCR), Boiler K8 in ENEA Wytwarzanie ”, Power Plant Kozienice.

POLIMEX-MOSTOSTAL S.A. – „Execution of work related to I&C systems installation for non-block objects for newly built Power Unit 1075 MW No 11 in ENEA Wytwarzanie”, Power Plant Kozienice.

VALMET TECHNOLOGIES – „Complete performance of electrical and I&C systems installation works along with designing and commissioning for newly built SCR installations K1,K2,K3,K4 and FGDP in CIECH Soda Inowrocław”.

VALMET TECHNOLOGIES – „Complete performance of electrical and I&C systems installation works along with designing and commissioning for newly built Flue Gas Desulfurization Plant (FGDP) installation and auxiliary switchboard modernization in CIECH Soda Janikowo”.

ENEA Wytwarzanie Sp. z o.o. – „Modernization of the Distributed Control System (DCS) for Unit No. 3”, Power Plant Kozienice”.

MONDI Świecie S.A. – „Modernization of the Paper Machine MP1- I&C systems installation of  drying section”.

DOOSAN Babcock Energy Polska S.A.– „Performance of work related to laying of communication cables on routes: DCS- controller ES-16 compressor room DCS-ashes- light oil tank monitoring system – counters E+H in the technological room of the light oil pumping station”, Thermal Power Plant Zofiówka, Jastrzębie-Zdrój.

PORR Polska Infrastructure S.A. – „Warranty service of electrical systems in the Biomass installation, Thermal Power Plant Siekierki”, Warszawa.

VALMET Automation Sp. z o.o. –  „Modernization of the Distributed Control System (DCS) Unit BC50 No 1. Delivery, installation works and commissioning of electrical parts – EC4, Veolia Energia Łódź S.A.”.

PBG Oil and Gas Sp. z o.o. – „Designing and supplying electrical and I&C systems installation in the „turnkey” solution for  SCR installation, Boiler K9 and K10 in Enea Wytwarzanie”, Power Plant Kozienice.

ASHLAND Polska Sp. z o.o. – „Performing assembly work related to I&C systems installation for expansion of the Gelcoat Production Plant”, Miszewo.

TRUMPF HUETTINGER Sp. z o.o. – „Installation of control cabinets and power cabinets, installation of power electronic devices”, Zielonka.

Mitsubishi Hitachi Power Systems Europe GmbH – „Execution of teletechnical installation for MHPSE office facilities in Power Plant Turów”.

Instytut Automatyki Systemów Energetycznych Sp. z o.o. -„I&C systems installation work, control cabinet installation and cabling as part of the task „Modernization of the electronic turbine controller Unimat, Unit No. 8”, Power Plant Kozienice.

ZRE Katowice S.A. – „Implementation of electrical works for modernized system in Enea Wytwarzanie, Unit No. 9 and 10”, Power Plant Kozienice.

FMK Sp. z o.o. – „ Modernization of wagon tippler No. 3 as part of an investment project I9040M0091 and I9040M0092”, Power Plant Kozienice.

ZRE Katowice S.A. – „Electrical engineering works of control cabinets in Enea Wytwarzanie”, Power Plant Kozienice.

ENEA Wytwarzanie Sp. z o.o. – „Modernization of the sampling and cooling water supply system of the physicochemical measurements on the Unit No. 10”, Power Plant Kozienice.

Polimex-Energetyka Sp. z o.o.  Electrical and I&C systems installation works for the task „Construction of semi-dry flue gas desulfurization installation with the installation of dry ash distribution for two Benson OP-206 boilers”, Project Pomorzany, Szczecin.

MONDI Świecie S.A. – „Execution of electrical works – Paper Machine No.7”.

Sumitomo SH FW Energia Polska Sp. z o.o. – „I&C systems installation in Fortum Silesia S.A.” – Zabrze.

MONDI Świecie S.A. – „Complete performance of work related to I&C systems installation for Paper Machine No. 1-5.”

Instytut Automatyki Systemów Energetycznych Sp. z o.o. – „I&C systems installation with cables and equipment supply on the Unit No. 10”, Power Plant Kozienice.

Elektromontaż Gdańsk S.A. – „Electric heating installation along with route implementation and assembly of the indicated sections of secondary routes under DCU 0960 construction”, Grupa Lotos S.A., Gdańsk.

APS Energia – „Installation of rectifiers and accumulator batteries with cabling, commissioning and functional tests “, Lotos Gdańsk.

VALMET TECHNOLOGIES – „Prefabrication of junction boxes and transformer protection boxes”, CIECH Soda Inowrocław and Janikowo.

Mitsubishi Hitachi Power Systems Europe GmbH – „Prefabrication of control boxes in Enea Wytwarzanie”, Power Plant Kozienice.

2016

Emerson Process Management, Power and Water Solutions sp. z o.o. – „Engineering and installation works in Control & Instrumentation Systems for Ovation system in ENEA Wytwarzanie (Power Plant Kozienice) ”

APS Energia S.A. – „Power Distribution Systems and Control & Instrumentation Systems installation works for APS Energia – Stanisławów Pierwszy”

ENEA Wytwarzanie S.A. – „Modernization of Distributed Control System for unit No 4,5 and 6 in ENEA Wytwarzanie (Power Plant Kozienice)”

Doosan Babcock Energy Polska sp. z o.o. – „Modernization of the turbine drainage system TG-5 for unit No 5 in ENEA Wytwarzanie (Power Plant Kozienice)”

POLTRAMP YARD S.A. – „Power Distribution Systems installation works on a ship unit BoDo Constructor, Świnoujście”

Instytut Automatyki Systemów Energetycznych sp. z o.o. – Carrying out of Control & Instrumentation Systems installation for project „Modernization of the Digital Complex Security System of unit No 5 ”in ENEA Wytwarzanie (Power Plant Kozienice)

ELSTA sp. z o.o. – „Control & Instrumentation Systems installation works in ENEA Wytwarzanie (Construction of the Power Unit 11, Power Plant Kozienice)”

VALMET TECHNOLOGIES – „Control & Instrumentation Systems installation works for Soda Ciech, Inowrocław”

POLIMEX-MOSTOSTAL S.A. – „Carrying out of Control & Instrumentation Systems installation works on objects: cooling water pumping station, cooling water piping in turbine hall, raw water system and management of technological waste water for ENEA Wytwarzanie (Power Plant Kozienice)”

ZRE Katowice S.A. – „Electrical and I&C Erection work connected with precoated filter casing in the building of Station DEMI II in ENEA Wytwarzanie (Power Plant Kozienice)”

VALMET TECHNOLOGIES – „Control & Instrumentation Systems installation works for Selective Catalytic Reduction system (SCR) for Soda Ciech, Inowrocław”

PORR Polska Infrastructure S.A. – „Power Distribution Systems for Elektrociepłownia Siekierki”

POLIMEX-MOSTOSTAL S.A. – „Control & Instrumentation Systems installation works for water installation DEMI II in ENEA Wytwarzanie (Power Plant  Kozienice)”

POLIMEX-MOSTOSTAL S.A. – „Carrying out of Control & Instrumentation Systems installation works in ENEA Wytwarzanie (Power Plant Kozienice)”

PLESMAR sp. z o.o. – „Control & Instrumentation installation works for the purpose of building a school in Wilanów”

CERNEY S.A. – „Power Distribution Systems installation works in ENEA Wytwarzanie (Power Plant Kozienice)”

VALMET TECHNOLOGIES – „Electrical engineering works and installation works within the scope of Control & Instrumentation works related to Flue Gas Desulfurization Plant for Soda Ciech, Inowrocław”

VALMET TECHNOLOGIES – „Control & Instrumentation installation works for Soda Ciech, Janikowo”

RAFAKO S.A. „Implementation of teletechnical installation for Elektrociepłownia, Grupy Azoty Zakładów Azotowych Kędzierzyn S.A.”

2015

Mitsubishi Hitachi Power Systems, Ltd.S.A. Poland – „Supply of Transformers and Switchgears, Modification Work of Existing Equipment and Electrical and I&C Erection Work fot the SCR Plant Kozienice Boiler K1 and K2 in Poland”;

ENEA Wytwarzanie sp. z o.o.– Modernization activities of DCS automation systems and sample collector cooling water supply system for Unit 1 and 2;

INSTAL Kraków S.A.–Carrying out Control & Instrumentation Systems installation for project “Construction of flue gas ducts, booster fans and support channels starter for Flue Gas Desulphurization (FGDP IV) for a capacity of approx. 800 MWe (for units No. 1-8) in ENEA Wytwarzanie sp. z o.o.”;

MONDI Świecie S.A. – Carrying out of Control & Instrumentation systems installation for MP4 and Mass semichemical;

POLIMEX- MOSTOSTAL S.A. –Power distribution systems and Control & Instrumentation systems modernization for Gypsum Transportation system – Installation of Flue Gas Desulfurization IOS IV ENEA Wytwarzanie sp. z o.o.;

SAVEX S.A./ SterEnergo Projekt sp. z o.o. – Modernization of Smokestack 3 within the scope of Power Distribution systems, Lightning Protection systems, Control & Instrumentation systems and System of Continuous Monitoring Emissions (SCME) in Kozienice Power Plant;

Instytut Automatyki Systemów Energetycznych sp. z o.o.Equipment & Wiring installation and supplying within the scope of work “Carrying out Unit protection digital system in terms of oil burners control system for Units 1 and 2” for ENEA Wytwarzanie sp. z o.o.;

Instytut Automatyki Systemów Energetycznych sp. z o.o.– Equipment & Wiring installation and supplying within the scope of work “Modernization of turbine dynamic mode control system of Units 1 and 2”  for ENEA Wytwarzanie sp. z o.o.;

INELSEV s.r.o. – Control & Instrumentation systems installation works in Synthos S.A.;

MTM Projekt  sp. z o.o.– Power distribution systems installation works related to SCR system for Boilers K7 and K8 at Power Plant “Rybnik”;

AIUT sp. z o.o.– Installation works on site of Synthos S.A.;

AUTEL sp. z o.o.– Vibration measurement systems installation works for MONDI Świecie S.A.;

ABB sp. z o.o.– Control & Instrumentation systems installation works of Flue Gas Desulphurization unit for Power Plant “Turów”;

TAMAR sp. z o.o. sp. k.– Carrying out modernization of Turbine TG1 and TG2 Drainage systems for ENEA Wytwarzanie sp. z o.o.;

PROCOM SYSTEM S.A.– Carburizing system modernization – ETAP IV – Replacement of LV Main Distribution Boardfor ENEA Wytwarzanie sp. z o.o.;

Bilfinger Industrial Services Polska sp. z o.o.– Installation works on the site of Combined Thermal and Heat Power Plant “Siekierki”;

Ethos Energy sp. z o.o.– Installation works for TG-2 on the site of Kozienice Power Plant;

REMEL sp.z o.o. – Carrying out supply and installation works of Control & Instrumentation systems – MONDI Świecie S.A.;

Doosan Babcock Energy Polska sp. z o.o. – Power Distribution systems and Control & Instrumentation systems installation works related to reconstruction of DCS in SEJ Combined Thermal and Heat Power Plant “Zofiówka”;

Chemoproject Nitrogen a.s.– Installation works on the site of AZOMURES S.A.- Romania;

MONDI Świecie S.A. – Control & Instrumentation installation works – modernization of MP2;

ZRE Katowice S.A.– Control & Instrumentation installation works for Boiler K1 and K2 in Enea Wytwarzanie sp. z o.o.

 

2014

ENEA Wytwarzanie S.A.–  Modernization of DCS Automation systems for Units 3 and 4 on the site of Kozienice Power Plant;

SIRIUS POLSKA Sp.z o.o.– Flue Gas Desulphurization unit construction (Stage IV) in Enea Wytwarzanie sp. z o.o.;

ENEA Wytwarzanie S.A – Modernization of the I&C system of physicochemical measurements on Unit 5 and 7 on the site of Kozienice Power Plant;

MONDI Świecie S.A. – Replacement of sensors wiring in Paper Machine 5 (MP5);

Mega-System Przedsiębiorstwo Instalacyjne Bogusław Myrcha – Carrying out installation works of Solar Power Plant (capacity 20kWp) on the roof of production shop „Korczowa”;

·         ENEA Wytwarzanie S.A.–  Control & Instrumentation systems repair works on Units 8x200MW and 2x500MW and on the site of Kozienice Power Plant;

·         ZPAS-NET Sp. z o.o.– Modernization of automation systems DCS on unit No. 10 on the site of Kozienice Power Plant;

·         AUTEL Sp.z o.o. – Installation works and supply within the scope of work Control & Instrumentation systems of Papier Machine MP5 – MONDI  Świecie S.A.”;

Instytut Automatyki Systemów Energetycznych Sp.z o.o. – Equipment & Wiring installation and supplying within the scope of work “Modernization of turbine dynamic mode control system of Unit 7”  for ENEA Wytwarzanie sp. z o.o.

ENEA Wytwarzanie S.A.–  Carrying out DCS automation system modernization of Unit 7 on the site of Power Plant Kozienice;

AGP Metro Polska S.C. – Production, supplying and commissioning of 250 pcs. LV Distribution boards for 7 stations of II line of Warsaw Metro;

TAMAR Sp. z o.o. Sp. k. – Power distribution systems installation works within the scope of work „Modernization of turbine drainage system for Unit TG-7 in ENEA Wytwarzenie sp. z o.o.;

Emerson Process Management, Power and Water Solutions Sp. z o.o. – Supply, installation works and commissioning „turnkey” of Control &  Instrumentation systems for Wet Flue Gas Desulfurization unit CHP Plant Gdynia;

Emerson Process Management, Power and Water Solutions Sp. z o.o. –  Supply, installation works and commissioning „turnkey” of Control &  Instrumentation systems for Wet Flue Gas Desulfurization unit – Kogeneracja Wrocław;

PPHU TECHMONT – Cable installation works for boiler facilities  – ENEA Wytwarzanie sp. z o.o.;

EthosEnergy Sp. z o.o. – Control & Instrumentation installation works at turbine set TG-7 Power Plant Kozienice;

ENEA Wytwarzanie S.A. – DCS Automation systems modernization at the Unit 8 on the site of Power Plant Kozienice;

OMC ENVAG Sp.z o.o. – Carrying out Control & Instrumentation installation works of SCME system for Flue Gas Desulfurization Unit IV on the site of Power Plant Kozienice;

PPU EKOWENT Sp.z o.o. – Contracts of carrying out Power Distribution systems and Control & Instrumentation systems installation works for auxiliary fans in Power Plant Kozienice;

·         Mitsubishi Hitachi Power Systems, Ltd.S.A.  Poland –  Electrical Engineering works and Installation works within the scope of Control & Instrumentation works related to Denitrification Gas Unitat the site of Power Plant Kozienice;

ENERGOSTER Sp. z o.o. – Carrying out cable installation works within servomotors set SP and NP and cable & equipment supply for turbine set TG-7 Power Plant Kozienice;

·         POLIMEX-MOSTOSTAL  – Control & Instrumentation system modernization of the Gypsum transportation system Kozienice Power Plant;

AIUT Sp. z o.o. – Carrying out Control & Instrumentation installation works on the site of Synthos Dwory S.A.”

2013

Emerson Process Management Power and Water Solutions Sp. z o.o.– Control & Instrumentation installation works while connecting facilities to DCS system during construction works of Flue Gas Denitrification Unit for the Boilers K4-K8 Kozienice Power Plant;

RAFAKO SA– Control & Instrumentation systems and cable routes installation works at Flue Gas Denitrification Unit for the Boilers K4-K8 Kozienice Power Plant;

NAVITEL sp.z oo.– Supply and installation works of renewable source energy hybrid system (solar panels, wind turbine and generator) to feed a telecommunication equipment station;

ENEA Wytwarzanie SA o. Elektrownia Kozienice  – Supply, installation works and commissioning of remote station sampling of water and wastewater over Row Michałowski and data transmission system to Kozienice Power Plant;

PROCOM Automatyka Przemysłowa sp.z oo.– Supply and installation works of ammonia detection system for Flue Gas Denitrification Unit for the Boilers K4-K8 Kozienice Power Plant;

TAWI sp. z oo.– Control & Instrumentation systems and cable routes installation works during mounting activities of Steam Turbine set 1,6MW, modernization of LV Auxiliary Loads panel, also supply, installation works and commissioning of new busduct system on the site of CH&P Plant “Starograd Gdański” ;

METSO Automation Polska sp.z oo.– Control & Instrumentation systems and Power Distribution systems site review activities, new equipment supply, installation works during modernization of the Unit BC100 on the site of “Dalkia” CH&P Plant – IV Łódź;

ENEA Wytwarzanie SA o. Elektrownia Kozienice  – Control & Instrumentation systems modernization of Physicochemical measurements system  and cooling system for the Units 6 and 8 on the site of Kozienice Power Plant;

AUTEL SA, Trinec, Czechy– Control & Instrumentation systems and cable routes installation works under modernization of Papier Machine MP-2 MONDI Świecie;

Polimex-Mostostal SA– Carrying out works in the field of Power Distribution and Control & Instrumentation systems of Drainage pipeline for Turbine TZ8 on the site of Kozienice Power Plant;

ABB sp.z oo.– Power Distribution and Control & Instrumentation systems installation works for II Line of Warsaw Metro ;

KINGSPAN sp.z oo. Lipsko– Carrying out electrical equipment installation works and programming PLC under Insulation Sandwich panels production line control systems replacing activities;

REMEL sp.z oo. Świecie – Carrying out cable routes installation works under modernization of Papier Machine MP-4 on the site of Pulp and Paper Plant “ARCTIC PAPER” Kostrzyń

2012

Elektrobudowa SA– Project of ENEFIT280, NARVA, ESTONIA. Carrying out cable routes installation works on the site of Bituminous schists oil obtaining facility;

PROCOM System SA– Modernization of LV Distribution Board RWA-RWB in the Carburizing Central Control room on the site of Kozienice Power Plant;

ENEA Wytwarzanie SA o. Elektrownia Kozienice  – Control & Instrumentation systems modernization of the Unit 3 Kozienice Power Plant;

JTC SA– Control & Instrumentation systems and cable routes installation works for a new biomass boiler (50MWth capacity) in Power Plant “Jaworzno II”;

Instytut Automatyki Systemów Energetycznch Sp. z o.o.– Unit KUZB protection system modernization and installation works within the scope of Measurements system modernization of the Unit 3 Kozienice Power Plant;

SKANSKA  SA– Supply, installation works and commissioning of Vertical axis Wind Turbine set 3kW capacity on the site of America School of Warsaw in Konstancin-Jeziorna;

Energotechnika-Energorozruch SA– Control & Instrumentation systems and cable routes installation works under oil burners mounting activities at the Unit 3 TPP “Kozienice”

Energoster sp.z oo.– Control & Instrumentation systems and cable routes installation works, delivery of cables for HER regulator at the Unit 3 TPP “Kozienice”

Polimex-Mostostal SA– Electrical equipment installation works for the Turbine TZ3Drainage systems pipelines Kozienice Power Plant;

APS Energia SA– Supply, mounting works and commissioning of emergency power supply diesel-generator 500kW capacity for  ZEC Bielsko-Biała;

TurboCare sp. z oo.– Control & Instrumentation systems dismounting / mounting works, special measurements and data removal / implementation of valves WP, SP under modernization of the Turbine set TZ6 (13K215) on the site of Power Plant “Dolna Odra”;

APS Energia SA–  Carrying out mounting works of emergency power supply system for EdF CH&P Plant Wrocław;

Elektrobudowa SA– Carrying out cable routes installation works  for Paper Machine MP6 of Pulp and Paper Plant STORA ENSTO Ostrołęka;

Polimex-Mostostal SA–Carrying out electrical equipment installation works for Turbine TZ6 Drainage system pipeline on the site of Kozienice Power Plant;

Zakłady Azotowe Puławy SA–Power Distribution systems, Electrical Lighting & Small Power systems installation works within warehouse and packing facility of solid fertilizers production line;

AUTEL SA, Trinec, Czechy– Control & Instrumentation systems and cable routes installation works at Turbine set 6,5MW and Heat Exchanger 14MW for PGE GiEKSA CH&P Plant Kielce;

BCE Systems sp.z oo.– Steel structures and electrical equipment installation works, supply of explosion decoupling system equipment for the Boilers K3, K5, K6 (OP-650) Kozienice Power Plant.

2011

Elektrownia Kozienice SA– DCS Automation systems modernization of the Unit 2;

Elektrownia Kozienice SA– Modernization of Aeration air heater installed in the Unit 2 ash removal system;

Sirius Engineers Polska Sp. z o.o.(HITACHI Group)– Carrying out catalytic flue gas denitrification system installation works for the Boilers 10, 11, 14 and 15 CH&P Plant Siekierki;

Elektrownia Kozienice SA– Unit 1 Coking plant modernization;

Emerson Process Management Power and Water Solutions Sp. z o.o.–Prefabrication of Ovation panel;

APS Energia SA– Carrying out mounting works;

Energoster Sp. z o.o. –  Control & Instrumentation systems installations works for TG-1 EHR system Kozienice Power Plant;

Elektrobudowa SA– Carrying out electrical testing activities on the construction site of Stadion Narodowy in Warsaw;

Polimex Mostostal S.A.– Control & Instrumentation systems and electrical equipment installation works at the Unit 1 Extraction of oil vapors system TPP “Kozienice”

Polimex Mostostal S.A.– Control & Instrumentation systems and electrical equipment installation works related to construction of Feeding steam to the coal mills system for the Boilers K-1…K-6 Kozienice Power Plant;

Dürr Poland Sp. Z o.o.– Carrying out Control panels installation works;

Elektrownia Kozienice SA– DCS Automation systems modernization at the Unit 4;

Instytut Automatyki Systemów Energetycznch Sp. z o.o.– Control & Instrumentation systems and external cable routes installation works also supply of electrical equipment and cables for the Boiler OP-650-040 and the Turbine 13K2150 Kozienice Power Plant;

PSE Wschód SA– Internal road cleaning and external fence conservation activities within 220kV Distribution facility area of 220/110kV Station;

Polimex Mostostal S.A.– Turbine TG-4 Drainage system modernization;

 

2010

Sirius Engineers Sp. z o.o. – Delivery, prefabrication and assembly of measurement cubicles for exhaust flue gas desulfurization installation IOS II, recipient Kozienice Powerplant

Zakłady Azotowe Puławy SA – Works regarding measuring industry of the modernization task of the manufacturing oxygenition-ammonia-urea facility

Elektrobudowa SA – Assembly of control cables and electrica works for bl. 858MW, PGE Bełchatów Powerplant

Kozienice Powerplant SA – Modernization od DCS automation at block 7

Institute of Power Systems Automation Sp. z o. o. – “The work of disassembly and assembly of the wiring and equipment on the block No. 7 in Kozienice SA

ZA Puławy SA – “Installation of heating pipes to the task of rebuilding a node discharge of benzene and cyclohexanone”

Stalowa Wola SA power plant Tauron Group – “Modernization of the Water Treatment Plant – measurement and automation instrumentation for the industry”

Power Plant SA – “Repair Station próbopobieraków on Block No. 10”

Elektrobudowa SA – “Installation of electric heating in PTA plant in the construction of installations for the production of Terephthalic Acid in Anwil Wloclawek”

JTC SA – “Implementation of the instrumentation assembly Wet FGD Siekierki Power Plant – Stage I

Preci Poland – “Implementation of cable routes for the construction of weights in Kozienice”

Energoautomatyka Sp. z o. o. – “Dismantling the installation of instrumentation for the task Modernization of Control and Supervision Unit No. 6 at PGE Power Station

PSE East – “Implementation of repairing the facade, roof and drainage compressor building in SE 220/100kV Zamość”

ENVAG – “Implementation of cable connecting the container with the data points to analyze the gases in Kozienice”

Procom System SA – “The installation of the control room to the task of modernization carburizing (the node 31, 32, 33), PGE Power Station

Elektrobudowa SA – Electrical and I&C forks for etoxylation installations in Płock aranged for PCC Rokita”

APS Energy SA – „ Electrical works PGE Opole Powerplan”

2009

Stalowa Wola Power Plant Tauron Group – Work performance of I&C systems in scope of boiler OP150,K11 adoption for burning an excessive amount of biomass.

Instytut Automatyki I Systemów Energetycznych Sp. z o.o. – Modernizing turbine dynamic control tuning for Unit no.8, Kozienice Power Plant

Instytut Automatyki Systemów Energetycznych Sp. z o.o. – „Modernizing technological protection for Unit no.8, Kozienice Power Plant

Clyde Bergemann Poland Sp. z o.o. – „Implementation of communication between ash blowing cabinet and DCS system, Kozienice Power Plant

Energoautomatyka Sp. z o.o. – „Assembly of I&C systems for task Control System Modernization and Supervision Unit no.4 in BOT Bełchatów Power Plant

Kozienice SA Power Plant – Modernization of automation systems of Block No. 8 (basic and group sequence in DCS Ovation) in object part of the facilities and modernization of crossroom Block No. 8

Wratislavia-Bio Sp. z.o.o. – Electrical and I&C forks for Desmet Ballestrém installations to catalyst reduction in Biodiesel Production Plant Bio-Wratislavia Sp. z.o.o.

ELPAK Sp. z.o.o. – The implementation of works and supply of I&C associated with the project of Tz-12 turbine delivery to the combined heat and power station Zeran along with the design and associated works. I&C industry. “

Power Kozienice SA – Overhaul of water sampling station for Unit No. 8

Power Kozienice SA – The renovation works of units 8x200MW, 2x500MW and blockout facilities

Elektra K.I.A.E.iP. – Electric assembly works at EC Wrocław Port City

Elektroaparatura Sp. z.o.o. – Assembly work of electrical installation in the HM Głogów”

Institute of Power Systems Automation Sp. z.o.o. – Modernization of the dynamic control system of the turbine state (special measurements) Block No. 9 of the Power Kozienice

Power Kozienice SA – Overhaul of water sampling station for Unit No. 9

Pulawy Nitrogen Works SA – Works regarding measuring industry of the modernization task of the manufacturing oxygenition-ammonia-urea facility

APS Energia Sp. z.o.o. – Construction works, installation of air conditioning and cable for ODM and RCN PSE-South SA”

Power Kozienice SA – Replacing cables on the DC power supply block of the I&C control room No. 5 and 6

 

2008

Polimex Mostostal S.A – Performance of documentations, supply, accomplishment of assembly, after assembly tests, commissioning, implementation of the warranty service in terms of I&C systems – Implementation of the installation of electricity generation from renewable energy sources ( biomass ) in Białystok Combined Heat and Power Plant .

Instytut Automatyki I Systemów Energetycznych Sp. z o.o. – Apparatus and cabling assembly – Modernizing turbine dynamic control tuning for Unit no.6 , Kozienice Power Plant

Kozienice Power Plant S.A – Overhaul of I&C systems for Unit no.5, 6, and 10 as well as common auxiliaries

Kozienice Power Plant S.A – Overhaul of I&C system for Unit no.5

Emerson Process Management Power and Water Solution Sp.z o.o. – Assembly of flue gas opacity meter before exhaust gas purification installation – Ostrołęka Power Plant Group.

I&C Energa AS – Assembly of I&C systems for Unit no.8 Electrenai Power Plant Lithuania.

Kozienice Power Plant S.A – Modernizing of unit DCS. DCS sequence group of OVATION system for Unit no.6 in scope of unit auxiliaries.

Energomontaż – Północ S.A – Assembly I&C components for biomass belt conveyors in Białystok Combined Heat and Power Plant .

Kozienice Power Plant S.A – Overhaul of water sampling station for Unit no.6

Schneider Electric Polska Sp. z o.o. – Assembly of closed loop control cubicles with entrusted elements for OS Piaseczno.

APS Energia Sp. z o.o. – Performance of converters cables connections for Świnoujście Navy Port.

APS Energia Sp. z o.o. – Performance of 220 V DC Power plant general electrical auxiliaries with two electrical power suppliers PB220/100MS with entrusted materials.

Emerson Process Management Power and Water Solution Sp.z o.o. – Assembly of OVATION system as well as delivery and field installation of I&C elements – modernizing of gas oil firing warm-up burner for Kozienice Power Plant Unit no.5

Elektra K.I.A.E.iP. – Remaking of 0,4kV substation fields in Kawęczyn Combined Heat and Power Plant.

Stalowa Wola Power Plant Tauron Group – Work performance of I&C systems in scope of boiler OP150,K11 adoption for burning an excessive amount of biomass.

Kozienice Power Plant S.A – Overhaul of water sampling station for Unit no.4

Energoster Sp. z o.o. – Assembly of I&C electrical parts for Kozienice Power Plant Unit no.5

Kozienice Power Plant S.A – Assembly of control and fibre optical cables in 400kV channel duct . Connection between 200MW Units and Central Electrical Control Room.

 

2007

Polimex Mostostal S.A – Implementation of works in the electro- energy and technical industry, as well as electrical heating for “Building of Chemical Sulphate Production Plant – PCC Rokita Brzeg Dolny”

Kozienice Power Plant S.A -Unit no.3 – overhaul of water sampling station

Kozienice Power Plant S.A – I& C overhaul as well as auxiliary systems for Unit no. 1, 2,3, 7,8

Emerson Process Management Power and Water Solution Sp.z o.o.-Preparing and carrying out the work for modernizing of I&C and measurement systems on Unit no.3 Karlshamnverket Sweden

I&C Energo AS – Assembly of I&C systems – unit no.7 Elektrenai Lithuania

Polimex Mostostal S.A – Installation of I&C systems for production section. Delivery and assembly for warehouse of Building no.1 together with Profibus and fibre optical cables lay out for Methyl – Ester Acid Plant in “Wratislavia – Bio” Sp. z o.o.

Akwawit – Brasco S.A – Technical assistance for Desmet Ballaster during commissioning in Methyl – Ester Acid Plant in “Wratislavia – Bio” Sp. z o.o.

Energoautomatyka Sp. z o.o. – Assembly of I&C elements – modernizing of control and supervision systems for BOT Bełchatów Power Plant Unit no.3

Puławy Nitrogen Plant – Modernizing of Sulfuric Acid and Oleum installation.

Instal Kraków S.A – Assembly of electrical and I&C systems – modernizing of flue gas inlet to chimney no.1, flue gas channels of unit no.2 and 3 together with inlet connection to chimney no.2 in Kozienice Power Plant.

Kozienice Power Plant S.A – Overhaul of I&C system for Unit no.1

Instal Kraków S.A – Assembly works of electrical and I&C systems for the subject of refurbishment of cooling system of air compressor station no.1 (compressor TS04 ) based on air forced cooler system with automatic oil temperature control of air compressor TS04 in Kozienice Power Plant.

Kozienice Power Plant S.A – Overhaul of digital control systems of Unit no.1. DCS WDPF system – field side.

Kozienice Power Plant S.A – Overhaul of I&C systems for cogeneration porpose.

 

2006

Emerson Process Management AG – Switzerland – “Delivery and assembly of I & C of Unit No.3 REK BITOWA – Macedonia”

Emerson Process Management Power and Water Solutions Sp. z o.o. – “I/O object test checkout of steam and gas turbine of Unit No 1”- Thermal Power Plant IMANTA Latvia

Puławy S.A Nitrogen Plant – “Perform a measurement trade work for a task of Melamine Recycling Section ( MRS )”

Emerson Process Management Power and Water Solutions Sp. z o.o. “Replacement of armored capillary tubing thermometers and perform turbine leak-off rack installations- turbine – generator set Tz – A , Żerań Thermal Power Plant

Zdzieszowice” Sp. z o.o. Coking Plant – “Temperature measurements of riser pipes of battery no.11”

Puławy S.A Nitrogen Plant – “Perform a measurement trade work for a task of purchase and assembly of PO2 pumps for acid circulation inside the absorption column KO1”

“Kozienice” S.A Power Plant – “Modernization of air cooling installation of flame control system of light oil burners of steam boiler no.K9 ( 1650 t/h ) “

“Kozienice” Power Plant SA – “Complex modernization of I&C systems of power units no.1, 2, 3, 4, 6, 9 and common auxiliaries”

Elektrobudowa SA – “Delivery, assembly, and start up of I & C installation, task: �odernization of smoke conduit no.2 – “Kozienice” Power Plant SA “

Instytut Automatyki Systemów Energetycznych – “Assembly of measuring apparatus and local and external cabling for turbine supervisory measurements of power unit no.4 -“Kozienice” S.A Power Plant “

Elektrobudowa SA – “Delivery, assembly and set in motion of I & C installations . Task: Modernization of forced air water cooling towers located in “Kozienice” S.A Power Plant “

“Kozienice” S.A Power Plant – ” Water Cooling Pumps -Perform an automatic change over to self-lubrication “

Polimex Mostostal Siedlce – “Cabling assembly for fitting by-pass of hot outgoing district heat water and steam. Introduce into system 12 operating condition signals of UPS for new turbine – generator set Tz-A – “Żerań Thermal Power Plant”

Emerson Process Management Power and Water Solutions Sp. z o.o. – “Diagnostics and faults remove from I&C systems .Object: turbine – generator Tz-A technological system and degassers installation – Żerań Thermal Power Plant “

Procom System SA – “Assembly and disassembly work concerning a task: Replacement of compressor control system, object: Cooper Turbo – compressor TA – 48 located in compressor house in Department of ash removal – BOT Turow S.A Power Plant. “

“Kozienice” S.A Power Plant – “Assembly of air control installation for boiler AP-1650 safety valves”

“Kozienice” S.A Power Plant – “Overhaul of water sampling system of power unit no 2”

“Kozienice” S.A Power Plant – “Overhaul of I & C boiler protection systems connected with exhaust flue gas desulfurization installation IOS II of power units no.2 and 4”

“Kozienice” S.A Power Plant – “Overhaul of I & C systems of power unit no 9”

Zakłady Remontowe Energetyki Lublin S.A. – Zakład Kozienice – “Modernization of electrical and I & C systems. Make a furnishing of additional coolers located in compressor house no.2 “Kozienice” S.A Power Plant

Elektrownia Kozienice SA – “Supply of control devices indirect heating systems of power unit no.9 safety valves.”

I&C Energo AS – “Cabling arrangements and connections – Elektrenai Power Plant Lithuania �

Impact Automotive Technologies Sp. z o.o. – “Carry out assembly work of Battery-packs according to the given documentation.”

Elektra KIAEiP – “Assembly of optical fibers in “Kozienice” S.A Power Plant.”

Elektroaparatura Sp. z o.o. -“Assembly of I & C installations in Wielbark IKEA Sawmill”

Elektrownia Kozienice SA – “Perform measurement of electric quantities of unit auxiliaries switch houses P and K sections A and B for active island purpose.”

Elektrobudowa SA – “Perform of I & C work. Task: Gypsum transport system from IOS II to the main gypsum store located in ” Kozienice” S.A Power Plant.”

 

2005

Emerson Process Management Power and Water Solutions Sp. z o.o – “Delivery and assembly of whole I & C systems of turbine-generator set Tz-A� Thermal Power Plant – Żerań Poland

Mostostal Pulawy S.A – Development of fluid gases reloading terminal for TEZEZ Sp. z o.o I & C systems.

Power Industry Overhaul Factories Lublin S.A – Kozienice Factory – Modernization of electrical and I & C systems of Demineralization Station II located in ” Kozienice S.A Power Plant .

“Kozienice S.A Power Plant – Overhaul of I & C systems of power units no 2,4( 200MW)

“Kozienice S.A Power Plant – “I & C modernization connected with reduction of technical minimum to Pmin=110 MW in range of object parts works.

“Kozienice S.A Power Plant – “Overhaul of I & C systems of power units no:1, 7, 8, 9, 10 as well as auxiliary objects

Kingspan Sp. z o.o – ” Replace and development of existing automatic control systems operated on store of raw materials for productions “

Emerson Process Management Power and Water Solutions Sp. z o.o – Complex modernization of I & C systems of power units no.8 ( 200MW ) “Kozienice S.A Power Plant

SICK Sp. z o.o – Delivery, prefabrication and assembly of measurement cubicles for exhaust flue gas desulfurization installation IOS II, recipient “Kozienice S.A Power Plant .

Pulawy Nitrogen Plant S.A. – Assembly of measurement systems. Object: Industrial water filtrate systems of Adela cooling installation.

Remak Rozruch S.A – Finishing and complete works of I & C systems. Szamotuły Gas Press Sampling Station.

“Stalowa Wola S.A Power Plant – Modernization of measurements, I & C systems. Control of steam pressure of turbine bleed no.1 system, and amount of deminaralized water to steam condenser of TG no.6

“Kozienice S.A Power Plant – Modernization of DCS OVATION control desk and measurements cubicles of power unit no.8

“Kozienice S.A Power Plant – Overhaul of water sampling system of power unit no.5

SICK Sp. z o.o – Delivery and assembly of junction boxes with overvoltage protectors for exhaust flue gas desulfurization installation IOS II. “Kozienice S.A Power Plant

“Kozienice S.A Power Plant –Overhaul of WDPF system control cubicle of power unit n8

 

2004

Emerson Process Management Power and Water Solutions Sp. z o.o. – “Modernizacja AKPiA bloku Nr 5 i 6” w Elektrowni Kozienice SA

Elektrownia Stalowa Wola SA – “Modernizacja układów pomiarowych sterowania i automatyki branży AKPiA w celu dostosowania układu ciepłowniczego do potrzeb zintegrowanej regulacji EL. II”

Elektrim Megadex SA – Dostawa i montaż części akpia dla części przyturbinowej dla zadania “Modernizacja turbozespołu TG6 w Elektrowni Stalowa Wola”

Elektrownia Stalowa Wola SA – “Modernizacja układów pomiarowych sterowania I automatyki branża akpia kotłów K-10 i K-11”

Instytut Automatyki Systemów Energetycznych – “Montaż aparatury i okablowania na bloku nr 5 w Elektrowni Kozienice SA w zakresie Elektrohydraulicznego układu regulacji i sterowania oraz pomiarów specjalnych turbiny”

Elektrownia Kozienice SA – “Remont stacji próbopobieraków na bloku nr 5”

SICK Sp. z o.o. – Wykonanie prefabrykatów i wierceń w kominie dla zadania “Opomiarowanie emisji spalin w EC Stomil Olsztyn”

Przedsiębiorstwo Pomiarów i Automatyki “PiA-ZAP” – Montaż i dostawa materiałów branży AKP na zadaniu inwestycyjnym “Modernizacja i intensyfikacja Instalacji Melaminy I” – Etap I w Zakładach Azotowych Puławy SA

Elektrownia Kozienice SA – “Modernizacja centralnej sygnalizacji bloku nr 5”

SICK Sp. z o.o. – Wykonanie prefabrykatów i wierceń w kominie dla zadania “Opomiarowanie emisji spalin w PESC Częstochowa SA”

Siltec Sp. z o.o. – “Wykonanie pomiarów instalacji energetycznej w obiekcie HP Polska”

Elektrownia Kozienice SA – “Remont AKPiA bloków 1 10 oraz obiektów poza blokowych”

Hewlett-Packard Polska Sp. z o.o. –“Prace modernizacyjne Rozdzielni Głównej w Nowym Sękocinie”

 

2003-2001

Elektrownia Stalowa Wola SA – “Modernizacja układów pomiarowych sterowania i automatyki branży AKPiA kotłów K8 i K9”

Procom-System SA (na zlecenie Simens Niemcy) – “Układanie kabli i łączenie w szafach w EC Wilno”

Elektrownia Kozienice SA – “Modernizacja palników gazowych blok nr 3 z dostosowaniem ich do istniejących palników olejowych”

Polska Telefonia Cyfrowa Sp. z o.o. – “Budowa wewnętrznych linii zasilających w 20907 – zasilanie siłowni nr 2”

Zakładach Azotowych Puławy SA – “Montaż układów pomiarowych, Obiekt: Węzeł filtracji roztworu mocznika D-115A”

Zakładach Azotowych Puławy SA – “Montaż okablowania urządzeń AKPiA Wytwórnia Melaminy III. Chłodnie Wentylatorowe”

Elektrownia Kozienice SA – “Modernizacja AKPiA związana z obniżeniem minimum technicznego bloków nr: 2, 6, 7 do Pmin=110MW w zakresie wykonawstwa części obiektowej”

Elektrownia Kozienice SA – “Modernizacja AKPiA obrębie pomiarów i sterowań kotła związanych z wymianą zaworów wtryskowych i rozruchowych na bloku nr 1”

ICS Polska Sp. z o.o. – “Instalacje elektryczne i AKPiA dla systemu podajników w Elektrociepłowni Firmy Black Red & White w Biłgoraju”

Firma Handlowo-Usługowa “Margo” – “Instalacje elektryczne w budowanym Zakładzie Konfekcjonowania Drobiu w miejscowości Garbatka Długa”

Polska Telefonia Cyfrowa Sp. z o.o. – “Przygotowanie instalacji zasilającej dla platformy IN6”

Techmatrans SA – “Prace montażowe instalacji elektrycznych na budowie Volkswagen Poznań”

Elektrownia Kozienice SA – “Remont AKPiA bloków 1 10 oraz obiektów poza blokowych”

Elektrownia Kozienice SA – “Wymiana rur impulsowych na pomiarach podciśnienia i różnicy podciśnienia w komorze paleniskowej kotła bloku nr 10”

APS Energia Sp. z o.o. – “Wykonanie prac montażowych na stacji “Karolinka” RE Piotrków Trybunalski”

Elektrownia Kozienice SA – “Oznakowanie na bloku nr 2 kabli automatyki i pomiarów turbiny i kotła oraz kabli sterowniczych napędów 6 kV, 0,4 kV na kotle”

 

downloadcatal

Contact


 

ENAP S.A.

Wilczkowice Górne 41, 26-900 Kozienice

ENAP S.A. Southern region of Poland

Porcelanowa 60 Street, room. 2, 40-246 Katowice

downloadcatal

.

 

.

 

 

SEARCH

                       NAVIGATION

                 MARKET

    OUR ACTIVITIES INCLUDE

..

..

..

                        » Our offer

                        » News

                        » Work

                        » References

                  » Industry

                  » Paper

                  » Power engineering

                  » Chemical

     » Preparation of project documentation

     » Gathering of required equipment

     » Producing of prefabricates

     » Delivery of materials and installation

     » Programming of control drivers

     » Conducting of adjustment

     » Mechanical and technological start-up

     » Preparation of project documentation

.

.

Firma ENAP S.A. uzyskała dofinansowanie z Unii Europejskiej ze środków Europejskiego Funduszu Rozwoju Regionalnego oraz z budżetu państwa na realizację projektu w ramach działania 1.5 RPO WM 2007-2013, pt: „Budowa oraz unowocześnienie zaplecza produkcyjno-usługowego na potrzeby uruchomienia produkcji urządzeń elektroenergetycznych wykorzystujących odnawialne źródła energii oraz usług w zakresie badań certyfikacyjnych”. Informacje źródłowe na temat Regionalnego Programu Operacyjnego Województwa Mazowieckiego 2007-2013 znajdują się na stronie: www.mazowia.eu